My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-043
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-043
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 12:18:53 PM
Creation date
3/7/2019 3:55:38 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
03/05/2019
Control Number
2019-043
Agenda Item Number
12.C.1.
Entity Name
Carter and Associates
Subject
Public access improvements for Sebastian Harbor Preserve
Area
Sebastian Harbor Preserve
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
to the requirements of the project design drawings and specifications. Provide certifications <br />upon completion of construction and review of contractor provided as-builts. <br />Fees for Task 6 services are estimated @ $2,100.00. <br />TASK 7 — REIMBURSABLE EXPENSES <br />Reimbursable expenses, such as postage, long distance calls, mileage, fax transmittals, prints, <br />copies, vellum, etc. <br />Fees for Task 7 services are estimated @ $500.00. <br />TOTAL ENGINEERING BUDGET <br />FOR TASKS 1 THRU 7 NOT TO EXCEED A FEE OF $24,900.00. <br />ENGINEERING SCOPE ASSUMPTIONS: <br />In developing this Scope of Services, ENGINEER represents to the INDIAN RIVER COUNTY <br />that the following assumptions have been made and that deviation from these assumptions may <br />require additional work and compensation on behalf of INDIAN RIVER COUNTY to the <br />ENGINEER. <br />I. This proposal specifically excludes all application and/or impact fees, which shall be the <br />responsibility of the INDIAN RIVER COUNTY. <br />2. This Scope of Services specifically excludes preparation of legal documents, easement <br />descriptions, structural, mechanical, electrical, and architectural work. <br />3. It is assumed that there is no new water or sewer improvements associated with this project. <br />In addition, there is an existing fire hydrant located on the north side of Englar Drive near the <br />southeastern corner of the property and is within 500 feet of the proposed pavilion for the <br />required fire protection. <br />4. Wetland planting design drawings and installation will be provided by others. <br />5. Construction stakeout and as-builts are not included with this proposal. <br />NtJHBIPROPOSALISebastian Harbor Preservedoc Page 4 of 5 <br />©2019 by CAI <br />1471j Since 1911 la <br />
The URL can be used to link to this page
Your browser does not support the video tag.