My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/15/2019 (2)
CBCC
>
Meetings
>
2010's
>
2019
>
01/15/2019 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2019 11:23:42 AM
Creation date
3/12/2019 1:09:13 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
01/15/2019
Meeting Body
Board of County Commissioners
Subject
Dodgertown Agreement
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
driveway restoration; regrading and grassing (sod); and traffic control. All right —of - <br />way shall be restored to like or better condition including sidewalks and drainage. <br />No excavation shall be left open when work is not actively being performed. <br />Construction fencing used in the work area shall not block sight distance near <br />intersections or driveways. All construction equipment and materials shall be stored <br />a minimum of 15 feet from the edge of pavement and shall be protected by Type II <br />barricades with flashing yellow lights. <br />The Contractor shall submit a Traffic Control Plan to the County.Traffic Engineering <br />Division a minimum of 72 hours prior to construction an/notify County Traffic <br />Engineering a minimum of 24 hours before any lane closures(A temporary access <br />plan shall be provided indicating how local traffic will becnaintained if the existing <br />road is removed and reconstructed. Stand mounted Advance:Construction signing. <br />shall be installed in accordance with FDOT Index 602. One lane closures shall be in <br />accordance with FDOT Index 603. When any work encroaches thetarea between <br />the centerline and two (2) feet outside the edge of pavement, 'traffic�shall be <br />restricted to a single lane. <br />The construction will provide existing utility customers that currently, only are <br />provided with water service, the ability`t connect'toothe IRC regional'wastewater <br />collection and treatment systern and the\connection of existing customers to the <br />system will provide opportunities for existing"residences to abandon existing septic <br />systems, which shall benefit the environment and water quality enjoyed by all Indian <br />River County residents. <br />ARTICLE 2 ENGINEER <br />The West Wabasso Community` Sewer System- Phase II has been designed by IRCDUS, <br />hereinafter called ENGINEER, and`who is to act as OWNER'S representative, assume all duties and <br />responsibilities andkhavelhe,rrights and`authorityy assigned to ENGINEER in the Contract Documents <br />in connection with completion of -the workNiri accordance with the Contract Documents. <br />ARTICLE.3 CONTRACT TIME <br />3.1 TheC ONTRACTOR shall be substantially completed with the following timeframe <br />(a) Within 1_5 calendar days from effective date of Notice to Proceed, Contractor shall <br />completee)following tasks: <br />1. Obtain all necessary permits. <br />2. Receive approved shop drawings for all materials and equipment to be <br />utilized on the job. <br />3. Perform all photographic recording and documentation of conditions prior to <br />construction. <br />4. Locate all existing utilities in the area of work. <br />5. Submit and secure approval of shop drawings. <br />6. Mobilize all labor, equipment, and materials. <br />7. Deliver and store all equipment and materials to the job site. <br />8. Notify all utilities and other affected parties prior to initiating construction. <br />(b) From 16 calendar days to 180 calendar days from the effective date of Notice to <br />148 <br />
The URL can be used to link to this page
Your browser does not support the video tag.