Laserfiche WebLink
SECTION 00530 — EJCDC STANDARD FORM OF AGREEMENT <br />BETWEEN OWNER AND CONTRACTOR ON THE BASIS OF A STIPULATED PRICE <br />West Wabasso Community Gravity Sewer System Phase 2 <br />ADDENDUM 2 <br />THIS AGREEMENT ("Agreement" or "Contract"), dated the day of in the <br />year 2018 by and between Indian River County, a political subdivision of the State of Florida <br />(hereinafter called OWNER) and .(hereinafter <br />rccalled CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree <br />as follows: <br />ARTICLE 1 WORK <br />CONTRACTOR as an independent contractor and'nottas an employee fur in sh <br />and complete all of the necessary labor, material, and equipment to perform'the.work <br />as specified or indicated in the Contract�Docurrants arld per FDEP, FDOT(Indian <br />County Department of Utility Services (IRCDUS) and County,Engineering Department <br />standards. The work is generally described as follows: \\/ <br />IRCDUS proposes to construct a,ew,8" Gravity(Sewer Collection System within <br />The Douglas Subdivision of West Wabasso. The\facilities shall provide sewage <br />collection infrastructure to serve about onehundred and one (101) lots on CR 510, <br />64th Avenue, 84th Street -84th Place,\63rd Court, 63rd Avenue and 62nd Avenue. The <br />gravity sewer main 'wiIl consist of about 5,750\feet of 8" PVC gravity sewer, 22 <br />manholes, service laterals\an1a new'IRCDUS\sanitary sewer lift station. The <br />Contractor shall also demolish alkseptic�tanks on the lots to be connected to the <br />laterals pe \ th�DOH standard and`quirements. The Contractor will direct <br />purchase and farnlh,tie ABS.`pumps and electrical package for the lift station <br />which includes two pumps, lifting cabl s, guide rails, guide rail assemblies, float <br />hang bracket\anchor bolt�liftin bales, upper guide brackets, SS nipples and <br />elbows, float switches,fhatch-covers for both the wet well and valve vault, duplex <br />control panel and `spre'parts set.'The Contractor will install the furnished pumps <br />acid -all appurtenances required to make the lift station operational. The Contractor <br />wilkalso direct,pur`chase the Dataflow telemetry system and the Contractor will <br />install telemetry at the lift.station and schedule Dataflow to program telemetry and <br />all necessary start-up features to make remote monitoring and operation of lift <br />station functional. Upon successful operation of lift station, Contractor shall <br />schedule a start-up with ABS to certify lift station has been installed in accordance <br />with manufacturer's requirements to affect warranty. No existing culverts are <br />proposed to be replaced. Any existing culverts damaged shall be restored to pre - <br />construction condition. <br />The construction of the utility improvements described above shall also consist of, <br />but not limited to: resetting of signs, mailboxes, and other existing facilities <br />disturbed during construction; utilities exploration; coordination with any permitting <br />agencies; trenching; clearing and tree removal; dewatering; installation of pipe, <br />structures and all appurtenances; soil backfill compaction; testing; (including T.V. <br />testing, exfiltration testing, backfill and subgrade testing); road, landscape and <br />147 <br />