My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/15/2019 (2)
CBCC
>
Meetings
>
2010's
>
2019
>
01/15/2019 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2019 11:23:42 AM
Creation date
3/12/2019 1:09:13 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
01/15/2019
Meeting Body
Board of County Commissioners
Subject
Dodgertown Agreement
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CM' <br />Mr. 1-Iimanshu H. Mehta, P.E. <br />Managing Director <br />November 26, 2018 <br />Page 2 <br />TASK 2.0 - FINANCIAL ASSURANCE <br />SWDD operates a Class I landfill and a Construction and Demolition (C&D) debris landfill facility <br />through a contract with Republic Services Inc. SWDD is required by Chapter 62-701, F.A.C. to <br />provide financial assurance for each of these facilities annually. <br />Task 2.1- Recalculation of the Closure Cost Estimates <br />CDM Smith prepared a recalculation of the estimated closing and long-term care costs for the Class 1 <br />and C&D debris landfill. CDM Smith used the recalculated closing and long-term care cost estimates <br />to complete the Closure Cost Estimating Form for Solid Waste Facilities for the both the Class I <br />landfill (includes the waste tire site) and the C&D debris landfill. The forms were submitted to FDEP <br />on August 31, 2018. <br />Task 2.2 - Survey and Airspace Assessment <br />Under this task, CDM Smith provided a survey and assessment of consumed airspace. The, survey <br />work was performed by Masteller, Moler, & Taylor, Inc. for the Class I and construction & <br />demolition (C&D) debris landfills. The topographic survey was performed on the entire IRC Landfill <br />site, including the Class I waste area (Segments I, II, and I1I as well as the ditches and roadways <br />surrounding the Class I area), the C&D debris landfill site (waste area, as well as the fence -line and <br />the surrounding ditches and berms adjacent to the C&D debris site), expansion areas, stormwater <br />pond, and administrative area. <br />The survey was transmitted to SWDD on May 16, 2018. The deliverable from Masteller, Moler, & <br />Taylor, Inc. consisted of a survey report identifying the date the field survey was completed and the <br />airspace consumed for the Segments II and III portions of the Class I landfill, as well as the C&D <br />debris landfill. The deliverable included the topographic survey, aerial photograph, and a compact <br />disk containing the AutoCAD files. <br />Task 2.1- Financial Assurance Report <br />CDM Smith prepared documentation that demonstrated proof of financial assurance for the cost of <br />closing and providing long-term care for the Class I landfill, the C&D debris landfill, and the waste <br />tire site. CDM Smith submitted the final Financial Assurance Report, which included <br />recommendations for Fiscal Year 2017-2018 escrow account balances to SWDD on October 5, 2018. <br />CDM Smith appreciates the opportunity to provide these services to IRC SWDD. If you have any <br />questions or require additional information on the above, project, please contact me. <br />„�380.a194 c"� <br />
The URL can be used to link to this page
Your browser does not support the video tag.