Laserfiche WebLink
Knight, McGuire Falcon Trace Phase 3A <br />Associates, Inc <br />I, Scott B.McGuire, a Florida Registered Engineer, License No. 39573, do hereby certify to Indian River County that a cost <br />estimate has been prepared under my responsible direction for those improvements itemized in this exhibit and that the <br />total cost estimated for said improvements is $4,396,880.20. This estimate has been prepared, in part, to induce approval <br />by the County of a Final Plat approval for Falcon Trace Phase 3A, and for the purpose of establishing property surety <br />amounts associate&th6rewith. The non -completed portions of these estimates has been estimated to be $745,082.02 <br />,��wh`oh Will be bonded at:.1'2-.5%,or:$931_,352.53. <br />j ir;crrtrrr; _ <br />t <br />Ij <br />2Q1 <br />Date . <br />FL Reg= NQ:.95r3 C <br />_. = <br />;j DescrlAtiore �. Quantity Unit Unti Price Amount Percentage <br />I✓arthwork, Incomplete <br />M"obilizab6n'""!•1 ' <br />1.00 <br />LS <br />$ <br />73,000.00 <br />$ <br />73,000.00 <br />10% <br />$ <br />7,300.00 <br />Sitet,Fence (dots Perimeter and <br />Con§vo4rea)=; <br />13,600.00 <br />LF <br />$ <br />1.00 <br />$ <br />13,600.00 <br />10% <br />$ <br />1,360.00 <br />Strip Siti�(To De Use bn-site) <br />3,000.00 <br />CY <br />$ <br />1.00 <br />$ <br />3,000.00 <br />10% <br />$ <br />300.00 <br />Soil Tracking Device <br />1.00 <br />EA <br />$ <br />2,500.00 <br />$ <br />2,500.00 <br />10% <br />$ <br />250.00 <br />Clearing / Grub <br />78.00 <br />AC <br />$ <br />1,100.00 <br />$ <br />85,800.00 <br />10% <br />$ <br />8,580.00 <br />Lake Excavation <br />360,000.00 <br />CY <br />$ <br />2.50 <br />$ <br />900,000.00 <br />10% <br />$ <br />90,000.00 <br />Lake Bank Soil Stabiliation w/ Sod <br />40,000.00 <br />SY <br />$ <br />2.50 <br />$ <br />100,000.00 <br />10% <br />$ <br />10,000.00 <br />36" RCP <br />585.00 <br />LF <br />$ <br />Subtotal <br />$ <br />1,177,900.00 <br />L.Subtotal <br />$ <br />117,790.00 <br />Grading <br />Rough & Finish Grade Pads 55,400.00 <br />SY <br />$ 1.00 <br />$ <br />55,400.00 <br />10% <br />$ <br />5,540.00 <br />Rough & Fisish Grade Road 18,700.00 <br />SY <br />$ 1.00 <br />$ <br />18,700.00 <br />10% <br />$ <br />1,870.00 <br />Rough Grade Green Areas including <br />berms 197,600.00 <br />SY <br />$ 0.75 <br />$ <br />148,200.00 <br />10% <br />$ <br />14,820.00 <br />10% <br />$ <br />Subtotal <br />$ <br />222,300.00 1 <br />Subtotal <br />$ <br />22,230.00 <br />Paving <br />12" Stabilized Subgrade <br />18,700.00 <br />SY $ <br />2.20 <br />$ <br />41,140.00 <br />10% <br />$ <br />4,114.00 <br />8" Cemented Coquina Base <br />17,700.00 <br />SY $ <br />11.00 <br />$ <br />194,700.00 <br />10% <br />$ <br />19,470.00 <br />1" Type Asphalt (First Lift Only) <br />16,800.00 <br />SY $ <br />6.45 <br />$ <br />108,360.00 <br />10% <br />$ <br />10,836.00 <br />1" Second Lift Asphalt <br />16,800.00 <br />SY $ <br />6.45 <br />$ <br />108,360.00 <br />100% <br />$ <br />108,360.00 <br />Curb <br />Mod Miami <br />11,200.00 <br />LF <br />$ <br />11.00 <br />$ <br />123,200.00 <br />10% <br />$ <br />12,320.00 <br />Type E <br />164.00 <br />LF <br />$ <br />13.00 <br />$ <br />2,132.00 <br />10% <br />$ <br />213.20 <br />Type F <br />940.00 <br />LF <br />$ <br />13.00 <br />$ <br />12,220.00 <br />10% <br />$ <br />1,222.00 <br />Type D <br />1,072.00 <br />LF <br />$ <br />11.00 <br />$ <br />11,792.00 <br />10% <br />$ <br />1,179.20 <br />4' Dia. Manholes <br />2.00 <br />EA <br />1 $ <br />Subtotal <br />$ <br />601,904.00 1 <br />Subtotal <br />$ <br />157,714.40 <br />5' Sidewalk (On -Site) 4,800.00 LF $ 18.00 1 $ 86,400.00 100% $ 86,400.00 <br />Subtotal $ 86,400.00 1 Subtotal $ 86,400.00 <br />Drainage <br />Remove Top and Replace <br />1.00 <br />EA <br />$ <br />1,725.00 <br />$ <br />1,725.00 <br />10% <br />$ <br />172.50 <br />4' Dia. Miami Curb Inlets <br />26.00 <br />EA <br />$ <br />3,031.40 <br />$ <br />78,816.40 <br />10% <br />$ <br />7,881.64 <br />4' Dia. Ditch Inlet <br />1.00 <br />EA <br />$ <br />3,172.85 <br />$ <br />3,172.85 <br />10% <br />$ <br />317.29 <br />5' Dia. Miami Curb Inlets <br />2.00 <br />EA <br />$ <br />5,060.00 <br />$ <br />10,120.00 <br />10% <br />$ <br />1,012.00 <br />4' Dia. Manholes <br />2.00 <br />EA <br />1 $ <br />3,033.70 <br />$ <br />6,067.40 <br />10% <br />1 $ <br />606.74 <br />Type E Control Structure <br />1.00 <br />EA <br />$ <br />4,289.50 <br />$ <br />4,289.50 <br />10% <br />$ <br />428.95 <br />Yard Drains <br />23.00 <br />EA <br />$ <br />1,012.00 <br />$ <br />23,276.00 <br />10% <br />$ <br />2,327.60 <br />36" RCP <br />585.00 <br />LF <br />$ <br />97.75 <br />$ <br />57,183.75 <br />10% <br />$ <br />5,718.38 <br />EXHIBIT "A" <br />01 <br />