Laserfiche WebLink
Bid / Pay Items <br />Change Order No. 2 <br />Lines that have Owner Direct Purchase are in blue <br />Item <br />Unit <br />Estimated <br />quantity <br />Unit Price <br />Original Total <br />Change Order No. <br />1 <br />Revised Unit Price <br />New Total after <br />CO No. 1 <br />e.2. Control Handhole with Rack 2=Feet x 2 -Feet x 2- <br />Feet <br />Ea. <br />2 <br />51,800.00 <br />53,600.00 <br />$1,800.00 <br />53,600.00 <br />e.3. Concrete Encased Duct bank <br />LS. <br />1 <br />563,000.00 <br />563,000.00 <br />563,000.00 <br />563,000.00 <br />e.4. Associated directional drilling, trenching, <br />excavation, backfill, and compaction as required for a <br />complete underground system <br />LS. <br />1 <br />59,500.00 <br />59,500.00 <br />$9,500.00 <br />59,500.00 <br />f. Site Lighting pole <br />Ea. <br />3 <br />53,175.00 <br />59,525.00 <br />53,175.00 <br />$9,525.00 <br />g. Branch Circuits and Feeders - All Conduit and Wire Per <br />Schedules on E-3 and E-4 with all necessary fittings, <br />pullboxes, supports, and appurtenances as required for a <br />complete and operable system including material, <br />installation, termination, and testing <br />LS. <br />1 <br />542,000.00 <br />542,000.00 <br />542,000.00 <br />542,000.00 <br />h. Short Circuit Coordination Study & Arc Flash Labels <br />LS. <br />1 <br />530,000.00 <br />530,000.00 <br />530,000.00 <br />530,000.00 <br />i. FPL Fee <br />LS. <br />1 <br />55,000.00 <br />55,000.00 <br />55,000.00 <br />55,000.00 <br />j. Miscellaneous Items <br />L.S. <br />_ 1 <br />50.00 <br />$0.00 <br />50.00 <br />IF. Survey <br />L.5. <br />1 <br />589,000.00 <br />589,000.00 <br />589,000.00 <br />589,000.00 <br />TOTAL BID ITEM 1 <br />55,760,570 <br />$0 <br />54,558,123 <br />Subtotal item 1 <br />0 <br />2. SEGMENT 2 PARTIAL CLOSURE AND LANDRLL GAS <br />SYSTEM EXPANSION <br />0 <br />2A. Partial Closure Construction <br />0 <br />a. Site Work <br />0 <br />a.1. Site Clearing and Preparation <br />L.S. <br />1 <br />550,000.00 <br />550,000.00 <br />550,000.00 <br />$50,000.00 <br />a.2. Site Grading <br />L.S. <br />1 <br />5250,000.00 <br />5250,000.00 <br />$250,000.00 <br />5250,000.00 <br />a.3. Common Fill <br />CY. <br />30,000 <br />512.00 <br />5360,000.00 <br />512.00 <br />5360,000.00 <br />b. Drainage & Containment <br />0 <br />b.1 Remove existing 15 -inch and 18 -inch downcomers <br />and replace w/ 24 -inch Corrugated HOPE Pipe <br />LE. <br />2,500 <br />520.00 <br />550,000.00 <br />-538 453.38 <br />54.62 <br />511,546.62 <br />b.2.244nch RCP <br />LF. <br />80 <br />5100.00 <br />58,000.00 <br />-52,598.27 <br />567.52 <br />55,401.73 <br />h.3.244nch Corrugated HOPE drainage pipe <br />LF. <br />2,000 <br />5100.00 <br />5200,000.00 <br />-5120,955.24 <br />539.52 <br />579,044.76 <br />b.4. 18 -inch Corrugated HOPE drainage pipe <br />LF. <br />1000 <br />580.00 <br />580,000.00 <br />-517,580.04 <br />567.42 <br />567,419.96 <br />b.5. 15 -inch Corrugated HOPE drainage pipe <br />LF. <br />570 <br />575.00 <br />539,000.00 <br />-522,104.67 <br />532.49 <br />516,895.33 <br />b.6.8 -inch Solid HOPE drainage pipe <br />LF. <br />400 <br />550.00 <br />520,000.00 <br />-58,364.80 <br />529.09 <br />_ 511,635.20 <br />b.7 8 -inch Perforated HOPE pipe <br />LF. <br />3000 <br />550.00 <br />5150,000.00 <br />-510,514,48 <br />54650 <br />5139,485.52 <br />b,8.4 -inch Perforated HDPE Underdrain <br />LE. <br />3,000 <br />525.00 <br />575,000.00 <br />-54,369.91 <br />52354 <br />570,630.09 <br />b.9. Fabric Formed Concrete Riprap <br />S.F. <br />11,500 <br />510.00 <br />5115,000.00 <br />510.00 <br />5115,000.00 <br />b.10. Flash Board Risers <br />Ea. <br />42 <br />52,000.00 <br />584,000.00 <br />-534,503.00 <br />51,278,50 <br />549,497.00 <br />c. New Asphalt Access Road <br />S.Y. <br />3,800 <br />$80.00 <br />5304,000.00 <br />$80.00 <br />5304,000.00 <br />d. Resurface Existing Asphalt Access Road <br />S.Y. <br />2,950 <br />510.00 <br />529,500.00 <br />510.00 <br />529,500.00 <br />e. LFG Collection Piping and Installation <br />0 <br />e.1.12 -inch SDR 17 HDPE Solid Pipe and Fittings <br />LF. <br />1,600 <br />550.00 <br />580,000.00 <br />550.00 <br />580,000.00 <br />e.2.10 -inch SDR 17 HOPE Solid Pipe and Fittings <br />LF. <br />1,350 <br />545.00 <br />560,750.00 <br />545.00 <br />560,750.00 <br />e.3.8 -inch 50R 17 HDPE Solid Pipe and Fittings <br />LF. <br />800 <br />540.00 <br />532,000.00 <br />540.00 <br />532,000.00 <br />e.4. 6 -inch S0R 17 HDPE Solid Pipe and Fittings <br />LF. <br />4,000 <br />530.00 <br />5120,000.00 <br />530.00 <br />5120,000.00 <br />e.5 4 -inch SDR 17 HOPE Solid Pipe and Fittings <br />LF. <br />500 <br />526.00 <br />513,000.00 <br />526.00 <br />513,000.00 <br />e.6. Vertical Extraction Well <br />V.F. <br />2,900 <br />5200.00 <br />5580,000.00 <br />5200.00 <br />5580,000.00 <br />e.7. Horizontal Extraction Well <br />Ea. <br />4 <br />514,800.00 <br />559,200.00 <br />514,800.00 <br />559,200.00 <br />e.8. Well Head <br />Ea. <br />39 <br />5950.00 <br />537,050.00 <br />$950.00 <br />537,050.00 <br />e.9. Miscellaneous Valves & Fittings <br />LS. <br />1 <br />550,000.00 <br />550,000.00 <br />550,000.00 <br />550,000.00 <br />e.10. Access Riser <br />Ea. <br />38 <br />51,000.00 <br />538,000.00 <br />51,000.00 <br />$38,000.00 <br />e.11. Zone Valve <br />Ea. <br />18 <br />53,600.00 <br />564,800.00 <br />53,600.00 <br />$64,800.00 <br />e.12. Summit Vent <br />Ea. <br />4 <br />512,000.00 <br />548,000.00 <br />512,000.00 <br />548,000.00 <br />f. Liner System <br />- <br />f.1.6 -inch Cap Foundation Layer <br />C.Y. <br />23,200 <br />526.00 <br />5603,200.00 <br />526.00 <br />5603,200.00 <br />1.2.40 -mil Linear Low-Densip Polyethylene <br />Geomelnbrane <br />S.F. <br />1,017,000 <br />50.40 <br />5406,800.00 <br />-5250,830.74 <br />501534 <br />5155,969.26 <br />f.3. Geocomposite Drainage Layer <br />S.F. <br />1,017,000 <br />50.55 <br />5559,350.00 <br />-5447,855.57 <br />50.1096 <br />5111,494 43 <br />f.4. Geocomposite Gas Venting Layer _ <br />S.F. <br />1,017,000 <br />50.40 <br />5406,800.00 <br />-5294,159.97 <br />50.1108 <br />5117,640.03 <br />1.5.18 -inch Protective Soil Layer <br />C.Y. <br />69,500 <br />526.00 <br />51,807,000.00 <br />526.00 <br />51,807,000.00 <br />1.6. 6 -inch Top Soil Cover <br />CY. <br />23,200 <br />512.00 <br />5278,400.00 <br />512.00 <br />5278,400.00 <br />1.7. Bahia Sod <br />S.F. <br />1,017,000 <br />50.22 <br />5223,740.00 <br />$0.22 <br />$223,740.00 <br />f.8. Metal Information Signs <br />Ea. <br />4 <br />5500.00 <br />52,000.00 <br />5500.00 <br />52,000.00 <br />g. Compressed Air and Forcemain Piping, Fittings, Valves, <br />and Ancillary Components <br />0 <br />g.l. 2 -inch DR 11 HDPE Compressed Air & Forcemain <br />Pipe (same trench) <br />LE. <br />15,200 <br />54.00 <br />560,800.00 <br />54.00 <br />560,800.00 <br />Smith. <br />1219) Act I.4,, <br />02011 COM Smith Inc. <br />11ehe1 Merved <br />156 <br />2 of 3 <br />