Bid / Pay Items
<br />Change Order No. 2
<br />Lines that have Owner Direct Purchase are in blue
<br />Item
<br />Unit
<br />Estimated
<br />quantity
<br />Unit Price
<br />Original Total
<br />Change Order No.
<br />1
<br />Revised Unit Price
<br />New Total after
<br />CO No. 1
<br />e.2. Control Handhole with Rack 2=Feet x 2 -Feet x 2-
<br />Feet
<br />Ea.
<br />2
<br />51,800.00
<br />53,600.00
<br />$1,800.00
<br />53,600.00
<br />e.3. Concrete Encased Duct bank
<br />LS.
<br />1
<br />563,000.00
<br />563,000.00
<br />563,000.00
<br />563,000.00
<br />e.4. Associated directional drilling, trenching,
<br />excavation, backfill, and compaction as required for a
<br />complete underground system
<br />LS.
<br />1
<br />59,500.00
<br />59,500.00
<br />$9,500.00
<br />59,500.00
<br />f. Site Lighting pole
<br />Ea.
<br />3
<br />53,175.00
<br />59,525.00
<br />53,175.00
<br />$9,525.00
<br />g. Branch Circuits and Feeders - All Conduit and Wire Per
<br />Schedules on E-3 and E-4 with all necessary fittings,
<br />pullboxes, supports, and appurtenances as required for a
<br />complete and operable system including material,
<br />installation, termination, and testing
<br />LS.
<br />1
<br />542,000.00
<br />542,000.00
<br />542,000.00
<br />542,000.00
<br />h. Short Circuit Coordination Study & Arc Flash Labels
<br />LS.
<br />1
<br />530,000.00
<br />530,000.00
<br />530,000.00
<br />530,000.00
<br />i. FPL Fee
<br />LS.
<br />1
<br />55,000.00
<br />55,000.00
<br />55,000.00
<br />55,000.00
<br />j. Miscellaneous Items
<br />L.S.
<br />_ 1
<br />50.00
<br />$0.00
<br />50.00
<br />IF. Survey
<br />L.5.
<br />1
<br />589,000.00
<br />589,000.00
<br />589,000.00
<br />589,000.00
<br />TOTAL BID ITEM 1
<br />55,760,570
<br />$0
<br />54,558,123
<br />Subtotal item 1
<br />0
<br />2. SEGMENT 2 PARTIAL CLOSURE AND LANDRLL GAS
<br />SYSTEM EXPANSION
<br />0
<br />2A. Partial Closure Construction
<br />0
<br />a. Site Work
<br />0
<br />a.1. Site Clearing and Preparation
<br />L.S.
<br />1
<br />550,000.00
<br />550,000.00
<br />550,000.00
<br />$50,000.00
<br />a.2. Site Grading
<br />L.S.
<br />1
<br />5250,000.00
<br />5250,000.00
<br />$250,000.00
<br />5250,000.00
<br />a.3. Common Fill
<br />CY.
<br />30,000
<br />512.00
<br />5360,000.00
<br />512.00
<br />5360,000.00
<br />b. Drainage & Containment
<br />0
<br />b.1 Remove existing 15 -inch and 18 -inch downcomers
<br />and replace w/ 24 -inch Corrugated HOPE Pipe
<br />LE.
<br />2,500
<br />520.00
<br />550,000.00
<br />-538 453.38
<br />54.62
<br />511,546.62
<br />b.2.244nch RCP
<br />LF.
<br />80
<br />5100.00
<br />58,000.00
<br />-52,598.27
<br />567.52
<br />55,401.73
<br />h.3.244nch Corrugated HOPE drainage pipe
<br />LF.
<br />2,000
<br />5100.00
<br />5200,000.00
<br />-5120,955.24
<br />539.52
<br />579,044.76
<br />b.4. 18 -inch Corrugated HOPE drainage pipe
<br />LF.
<br />1000
<br />580.00
<br />580,000.00
<br />-517,580.04
<br />567.42
<br />567,419.96
<br />b.5. 15 -inch Corrugated HOPE drainage pipe
<br />LF.
<br />570
<br />575.00
<br />539,000.00
<br />-522,104.67
<br />532.49
<br />516,895.33
<br />b.6.8 -inch Solid HOPE drainage pipe
<br />LF.
<br />400
<br />550.00
<br />520,000.00
<br />-58,364.80
<br />529.09
<br />_ 511,635.20
<br />b.7 8 -inch Perforated HOPE pipe
<br />LF.
<br />3000
<br />550.00
<br />5150,000.00
<br />-510,514,48
<br />54650
<br />5139,485.52
<br />b,8.4 -inch Perforated HDPE Underdrain
<br />LE.
<br />3,000
<br />525.00
<br />575,000.00
<br />-54,369.91
<br />52354
<br />570,630.09
<br />b.9. Fabric Formed Concrete Riprap
<br />S.F.
<br />11,500
<br />510.00
<br />5115,000.00
<br />510.00
<br />5115,000.00
<br />b.10. Flash Board Risers
<br />Ea.
<br />42
<br />52,000.00
<br />584,000.00
<br />-534,503.00
<br />51,278,50
<br />549,497.00
<br />c. New Asphalt Access Road
<br />S.Y.
<br />3,800
<br />$80.00
<br />5304,000.00
<br />$80.00
<br />5304,000.00
<br />d. Resurface Existing Asphalt Access Road
<br />S.Y.
<br />2,950
<br />510.00
<br />529,500.00
<br />510.00
<br />529,500.00
<br />e. LFG Collection Piping and Installation
<br />0
<br />e.1.12 -inch SDR 17 HDPE Solid Pipe and Fittings
<br />LF.
<br />1,600
<br />550.00
<br />580,000.00
<br />550.00
<br />580,000.00
<br />e.2.10 -inch SDR 17 HOPE Solid Pipe and Fittings
<br />LF.
<br />1,350
<br />545.00
<br />560,750.00
<br />545.00
<br />560,750.00
<br />e.3.8 -inch 50R 17 HDPE Solid Pipe and Fittings
<br />LF.
<br />800
<br />540.00
<br />532,000.00
<br />540.00
<br />532,000.00
<br />e.4. 6 -inch S0R 17 HDPE Solid Pipe and Fittings
<br />LF.
<br />4,000
<br />530.00
<br />5120,000.00
<br />530.00
<br />5120,000.00
<br />e.5 4 -inch SDR 17 HOPE Solid Pipe and Fittings
<br />LF.
<br />500
<br />526.00
<br />513,000.00
<br />526.00
<br />513,000.00
<br />e.6. Vertical Extraction Well
<br />V.F.
<br />2,900
<br />5200.00
<br />5580,000.00
<br />5200.00
<br />5580,000.00
<br />e.7. Horizontal Extraction Well
<br />Ea.
<br />4
<br />514,800.00
<br />559,200.00
<br />514,800.00
<br />559,200.00
<br />e.8. Well Head
<br />Ea.
<br />39
<br />5950.00
<br />537,050.00
<br />$950.00
<br />537,050.00
<br />e.9. Miscellaneous Valves & Fittings
<br />LS.
<br />1
<br />550,000.00
<br />550,000.00
<br />550,000.00
<br />550,000.00
<br />e.10. Access Riser
<br />Ea.
<br />38
<br />51,000.00
<br />538,000.00
<br />51,000.00
<br />$38,000.00
<br />e.11. Zone Valve
<br />Ea.
<br />18
<br />53,600.00
<br />564,800.00
<br />53,600.00
<br />$64,800.00
<br />e.12. Summit Vent
<br />Ea.
<br />4
<br />512,000.00
<br />548,000.00
<br />512,000.00
<br />548,000.00
<br />f. Liner System
<br />-
<br />f.1.6 -inch Cap Foundation Layer
<br />C.Y.
<br />23,200
<br />526.00
<br />5603,200.00
<br />526.00
<br />5603,200.00
<br />1.2.40 -mil Linear Low-Densip Polyethylene
<br />Geomelnbrane
<br />S.F.
<br />1,017,000
<br />50.40
<br />5406,800.00
<br />-5250,830.74
<br />501534
<br />5155,969.26
<br />f.3. Geocomposite Drainage Layer
<br />S.F.
<br />1,017,000
<br />50.55
<br />5559,350.00
<br />-5447,855.57
<br />50.1096
<br />5111,494 43
<br />f.4. Geocomposite Gas Venting Layer _
<br />S.F.
<br />1,017,000
<br />50.40
<br />5406,800.00
<br />-5294,159.97
<br />50.1108
<br />5117,640.03
<br />1.5.18 -inch Protective Soil Layer
<br />C.Y.
<br />69,500
<br />526.00
<br />51,807,000.00
<br />526.00
<br />51,807,000.00
<br />1.6. 6 -inch Top Soil Cover
<br />CY.
<br />23,200
<br />512.00
<br />5278,400.00
<br />512.00
<br />5278,400.00
<br />1.7. Bahia Sod
<br />S.F.
<br />1,017,000
<br />50.22
<br />5223,740.00
<br />$0.22
<br />$223,740.00
<br />f.8. Metal Information Signs
<br />Ea.
<br />4
<br />5500.00
<br />52,000.00
<br />5500.00
<br />52,000.00
<br />g. Compressed Air and Forcemain Piping, Fittings, Valves,
<br />and Ancillary Components
<br />0
<br />g.l. 2 -inch DR 11 HDPE Compressed Air & Forcemain
<br />Pipe (same trench)
<br />LE.
<br />15,200
<br />54.00
<br />560,800.00
<br />54.00
<br />560,800.00
<br />Smith.
<br />1219) Act I.4,,
<br />02011 COM Smith Inc.
<br />11ehe1 Merved
<br />156
<br />2 of 3
<br />
|