My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1958-003
CBCC
>
Resolutions
>
1950's
>
1958
>
1958-003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2023 9:49:43 AM
Creation date
4/2/2019 12:45:58 PM
Metadata
Fields
Template:
Resolutions
Resolution Number
1958-03
Approved Date
01/21/1958
Resolution Type
Tidal Waters Waterline
Bulkhead Line
Entity Name
Tidal Waters
Subject
Bulkhead Line Off Shore Regulations
Area
Sebastian, Indian River Shores, Vero Beach
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
►"258 <br />II On the South side of Sebastian River the bulkhead line is established as 50 feet <br />from the shoreline from the mouth of the Sebastian River West to the railroad bridge and <br />from the railroad bridge West to the tide water line the bulkhead line will be the existing II 40 <br />shoreline. <br />On the West side of the Indian River from the South City limits of the City of <br />Sebastian to the Wabasso Bridge the bulkhead line will follow the existing shoreline. <br />From the Wabasso Bridge on the West shore of the Indian River to the North limits ofI ' <br />i <br />the City of Vero Beach, follow the existing shoreline, however, �n the area North of the i <br />Winter Beach Bridge side and Hole in the Wall Island, jetties for protection of boat channels �I <br />may extend not more than 25 feet from the shoreline. <br />From the South City limits of the City of Vero Beach on the East shore of the ! <br />Indian River to Hells Pocket the bulkhead line is the existing shoreline. The. -off -lying <br />islands, the bulkhead line is the existing shoreline. From Hells Pocket on the East shore <br />of the Indian River South to the South County line the bulkhead line is 25 feet from the <br />shoreline; provided that in Porpoise Bay the bulkhead line is established at being the <br />existing shoreline. Provided further that where the existing shoreline is within 160 feet <br />of the North line of the South 660 feet of Government Lots 3 & 4S Section 21, Township 33, <br />Range,40, then in that event the bulkhead line may extend out into the water of Porpoise <br />Bay for a distance of 160 feet from said North line. <br />Provided further that this extension shall not extend Westward beyond the inter- <br />section of the shore and said North line. Provided further that where the shoreline is <br />within 160 feet of the South line of said Government Lots 3 & 4 then the bulkhead line may <br />extend out into Porpoise Bay to a point not more than 160 feet North of said South line and <br />provided the same shall not extend West beyond the intersection with the South line and the <br />shore. Also provided that in St. Christopher Harbor and St. Christopher Island the shoreline <br />is established as the bulkhead line. Further provided from the North end of Round Island <br />to'the South County line the shoreline will be the bulkhead line. <br />From the South City limits of Vero Beach on the West shore of the Indian River <br />follow the shoreline to the North line of the Oslo Road and from the North line of the Oslo <br />Road take a bearing of South 300 East and continue on that bearing to a point which is 200 <br />ii <br />feet from the existing shoreline, then following the existing shoreline a distance of 200 feet; <br />I <br />East and continue southward to the South County line. <br />SECTION 3 <br />From and after the effective date of this Resolution, no fill or filling or other i <br />creation or extension of lands.shall be made or maintained outward into the tidal waters of I <br />said County beyond said bulkhead line and no filling or dredging or similar activity shall <br />be made on the landward side of said bulkhead line without formal written approval from this <br />Board where said lands are located outside the limits of any municipality or from the govern- <br />ing body of any municipality where the lands are located within the territorial limits of <br />any municipality, which said approval shall be further subjeCt to the formal approval of the <br />Trustees of the Internal Improvement Fund of the State of Florida. <br />11 <br />0 <br />11 <br />40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.