Laserfiche WebLink
RESOLUTION 85-126 (con't) <br />Northbound - <br />Left -turn lane, two through lanes <br />Southbound - <br />Left -turn lane, two through lanes <br />Eastbound - <br />Left -turn lane, through/right-turn lane <br />Westbound - <br />Left -turn lane, one through lane, right -turn <br />lane; <br />c) construction and signalization when warranted of the <br />intersection at Indian River Boulevard/53rd Street to <br />the following geometrics: <br />Northbound - <br />Left -turn lane, right turn lane <br />Eastbound - <br />Right -turn lane, through lane <br />Westbound - <br />Left -turn lane, through lane <br />d) construction of the intersection at Indian River <br />Boulevard/SR 60 to the following geometrics: <br />Northbound - <br />Left -turn lane, two through lanes, right -turn <br />lane <br />Southbound - <br />Left -turn lane, two through lanes, right -turn <br />lane <br />Eastbound - <br />Left -turn lane, through lane, right -turn lane <br />Westbound - <br />Dual left -turn lanes, through lane, right -turn <br />lane; signalization revisions when warranted; <br />e) construction of 45th Street as a two-lane roadway <br />from U.S. #1 to Indian River Boulevard; <br />f) construction of the intersection at U.S. 1/45th <br />Street to the following geometrics: <br />Northbound - <br />Left -turn lane, two through lanes <br />Southbound - <br />Left -turn lane, two through lanes <br />Eastbound - <br />Left -turn lane, through lane <br />Westbound - <br />One left -turn lane, through lane signalization <br />revisions as required; and <br />g) Construction and signalization when warranted of the <br />intersection at Indian River Boulevard/45th Street to <br />the following geometrics: <br />Northbound - <br />Left -turn lane, through lane <br />Southbound - <br />Through lane <br />Eastbound - <br />Left -turn lane, through lane <br />Westbound - <br />Combination left, through, right -turn lane. <br />Page 11 <br />