My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1985-128
CBCC
>
Resolutions
>
1980'S
>
1985
>
1985-128
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2019 2:45:42 PM
Creation date
4/4/2019 2:44:22 PM
Metadata
Fields
Template:
Resolutions
Resolution Number
1985-128
Approved Date
10/23/1985
Entity Name
Grand Harbor Development of Regional Impact
Subject
Resolution establishing the development order approving the Development
Document Relationships
1989-021
(Cover Page)
Path:
\Resolutions\1980'S\1989
1992-068
(Cover Page)
Path:
\Resolutions\1990'S\1992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION 85-129 (con't) <br />b) construction and signalization when warranted of the <br />intersection at U.S. 1/53rd Street to the following <br />geometrics: <br />Northbound - <br />Left -turn lane, two through lanes <br />Southbound - <br />Left -turn lane, two through lanes <br />Westbound - <br />Left -turn lane, through lane and right -turn lane <br />Eastbound - <br />Left -turn lane and through/right-turn lane; and <br />C) construction and signalization when warranted of the <br />intersection at Indian River Boulevard/53rd Street to <br />the following geometrics: <br />Northbound - <br />Dual left -turn lane, right turn lane <br />Eastbound - <br />Right -turn lane, through lane <br />Westbound - <br />Left -turn lane, through lane. <br />56. The developer shall construct all project entrance <br />intersections to the following geometrics or as necessary <br />to maintain Level of Service C during average annual <br />conditions and Level of Service D during peak conditions: <br />a) the intersection of U.S. 1 and Project Entrance: <br />Northbound - <br />Right -turn lane, two through lanes <br />Southbound - <br />Left -turn lane, two through lanes <br />Westbound - <br />Double left -turn lanes, right -turn lane <br />signalization when warranted; <br />the developer shall provide yearly funding of all <br />synchronization, maintenance, and operational costs <br />associated with the signal; <br />b) the intersection of Indian River Boulevard and <br />Shopping Center: <br />Northbound - <br />left -turn lane, two through lanes <br />Southbound - <br />right -turn lane, two through lanes <br />Eastbound - <br />right -turn only lane; <br />c) the intersection of Indian River Boulevard and <br />Internal Road: <br />Northbound - <br />Left -turn lane, two through lanes, right -turn <br />lane <br />Southbound - <br />Left -turn lane, two through lanes, right -turn <br />lane <br />Eastbound - <br />Left -turn lane, two through lanes, right -turn <br />lane <br />Page 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.