Laserfiche WebLink
NASASSO CORRIDOR PLAN <br />MR ACTIVITIES <br />basso Corridor Plan to be successful, Indian River County <br />Icipate in corridor development. Accordingly, the county <br />the following actions within the corridor areas <br />Mill utilities underground, whenever possible; <br />Nill sidewalks in conjunction with county road and building <br />Micte; <br />Hili sidewalks and bikepaths,as programmed in the county's <br />path and sidewalk plan; <br />.der abandoning Old Dixie Highway, between CR 510 and US <br />Mirage the Florida Department of Transportation (FDOT) to <br />Mice (landscape) US 1 medians; <br />t; activities and uses within Causeway Park to those uses <br />w,ed to public access to the river and public events; <br />Mice perimeter landscaping along Causeway Park; <br />t,e and landscape center medians on CR 510 when right -of <br />*cones available; <br />live CR 510's intersections with both US 1 and Old Dixie <br />tay; <br />Mirage new developments to be designed to accommodate some <br />,he, anticipated stormwater run-off from future road <br />Bing projects; <br />to to corridor plan standards whenever it (the county) <br />.ops property within the corridor; <br />Ie the ultimate right-of-way required for CR 510 between <br />and the Wabasso Causeway to reflect a right-of-way <br />clition from the mainland to the bridge, thus minimizing <br />'Impact on residential areas; and <br />COUNTY PAGE 11 <br />