My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1995-146
CBCC
>
Resolutions
>
1990'S
>
1995
>
1995-146
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2019 3:04:31 PM
Creation date
4/9/2019 3:01:17 PM
Metadata
Fields
Template:
Resolutions
Resolution Number
1995-146
Approved Date
11/21/1995
Resolution Type
Corridor Plan
Entity Name
Wabasso Corridor Plan Task Force
Subject
Wabasso Corridor Plan
Area
Wabasso
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
wABASSO CORRIDOR PLAN <br />PUBLIC SECTOR ACTIVITIES <br />For the wabasso Corridor Plan to be successful, Indian River County <br />must participate in corridor development. Accordingly, the county <br />will take the following actions within the corridor area: <br />• install utilities underground, whenever possible= <br />• install sidewalks in conjunction with county road and building <br />projects; <br />• install sidewalks and bikepaths as programmed in the county's <br />bikepath and sidewalk plan; <br />• consider abandoning Old Dixie Highway, between CR 510 and US <br />1; <br />• encourage the Florida Department of Transportation (FDOT) to <br />enhance (landscape) US 1. medians; <br />• Limit activities and uses within Causeway Park to those uses <br />related to public access to the river and public events; <br />• enhance perimeter landscaping along Causeway Park; <br />• create and landscape center medians on CR 510 when right-of- <br />way becomes available; <br />• improve CR 510's intersections with both US i and Old Dixie <br />Highway; <br />• encourage new developments to be designed to accommodate some <br />of the anticipated stormwater run-off from future road <br />widening projects; <br />• adhere to corridor plan standards whenever it (the county) <br />develops property within the corridor; <br />• revise the ultimate right-of-way required for CR 510 between <br />US 1 and the Webasso Causeway to reflect a right-of-way <br />transition from the mainland to the bridge, thus minimizing <br />the impact on residential areas; and <br />INDIAN RIVER COUNTY PAGE 11 <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.