My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1995-146
CBCC
>
Resolutions
>
1990'S
>
1995
>
1995-146
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2019 3:04:31 PM
Creation date
4/9/2019 3:01:17 PM
Metadata
Fields
Template:
Resolutions
Resolution Number
1995-146
Approved Date
11/21/1995
Resolution Type
Corridor Plan
Entity Name
Wabasso Corridor Plan Task Force
Subject
Wabasso Corridor Plan
Area
Wabasso
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MABASSO CORRIDOR PLAN <br />Isms <br />• US 1 and CR 510 Landscape Buffers Landscape buffers help to <br />separate uses and provide an open and natural appearance. <br />Such buffers can also hide what is unaesthetic and complement <br />what is aesthetic. <br />To enhance the appearance of the corridor from US 1 and CR 510 <br />and from adjacent sidewalks and bikeways, to maintain an open <br />and natural appearance to the corridor, and to retain and <br />promote property values within the corridor, a special <br />landscape feature along the US 1 and CR 510 frontages of new <br />development sites is necessary. Wherefore, within the plan <br />area the following landscape requirements shall apply. <br />• Landscape Buffer Along US i and CR 510 <br />The county -wide landscaping requirements of LDR Chapter 926 shall <br />apply except as noted in this plan. The following landscape buffer <br />shall be provided along the entire length of a site's CR 510 and US <br />1 frontages, except for approved driveways: <br />Minimum Planting/Berm <br />Buffer Width Requirements per 100' <br />4 canopy trees <br />5 understory trees <br />20' or more Continuous hedge*: 1f'-21' <br />high at planting <br />Beres: 11'-3' high* <br />4.5 canopy trees <br />5.5 understory trees <br />15' Continuous hedge*: 11'-3' <br />high at planting <br />Berms 1'-21' high* <br />5 canopy trees <br />6 understory trees <br />10' Continuous hedge*: 21'-3' <br />high at planting <br />Berns 1•-11• high* <br />INDIAN RIVER COUNTY PAGE 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.