My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/20/1994
CBCC
>
Meetings
>
1990's
>
1994
>
12/20/1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:04:27 PM
Creation date
6/17/2015 2:53:20 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
12/20/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
View images
View plain text
BOOK FAaE. <br />ON MOTION by Commissioner Adams, SECONDED by <br />Commissioner Macht, the Board unanimously (4-0, <br />Commissioner Eggert being absent) authorized the <br />submittal of the application for the Community <br />Development Block Grant, as set out in the above <br />staff recommendation. <br />SANDRMGE GOLF CLUB "DUNES COURSE" RENOVATION <br />The Board reviewed the following memo dated 11/29/94: <br />DATE: November 29, 19 94 C/ JI <br />TO: Members of the Board of ty CommissiN�02snlll <br />SUBJECT: SANDRIDGE GOLF CL 'rtor S OURSE" RENOVATION PROGRAM <br />FROM: Bob Komarinet� ofGolf <br />Staff is planning a three phase renovation program on the "Dunes" <br />course at Sandridge Golf Club. Phase one will be the <br />reconstruction and slight relocation of the #18 hole green complex. <br />Phase two will be the reconstruction of greens #1 thru #8 and Phase <br />three would be the green reconstruction of the remaining 9 greens. <br />Phase one and two are planned for the summer of 1995 and Phase <br />three for the summer of 1996. <br />In both Phases two and three, nine holes will be closed during <br />construction. The loss of revenue will be negligible because this <br />is a non -peak period and 27 of the holes will remain open for play. <br />Estimated cost of Phase one will be approximately $50,000.00. <br />Total budget for Phase one and two is $190,000.00. The budget for <br />Phase three will be appropriated upon Board approval in the 1995/96 <br />golf course operating budget. All budgets include the necessary <br />architectural design fees anaall other related costs. <br />It will be necessary to hire a golf course architect to design and <br />prepare the bid documents to perform the work. <br />Links Designer, Inc. has been the Architect on both the previous <br />golf courses. Staff believes that it is important that the same <br />architect do the renovations as did the original design and is <br />requesting have the Board of County Commissioners approve the <br />retainage of Links Designer, Inc. to perform the necessary design <br />work. Compensation is 150 of construction cost of Phase one and 5o <br />of Phase two and three as specified in the August 24, 1994 letter <br />(see attached) in all phases of the project. <br />RECQM--MM DATION <br />Staff recommends to retain Links Designer, Inc. to perform the <br />architectural design and to assist through completion of the above <br />projects. <br />FUNDS AVAILABLE : ACCOUNT NUMBER 418-221-572-066.39 <br />12 <br />December 20, 1994 <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).