My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-046D
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-046D
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 12:20:21 PM
Creation date
4/16/2019 1:41:57 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
03/26/2019
Control Number
2019-046D
Agenda Item Number
8.L.
Entity Name
Arcadis US
Subject
Work Order 1, RAS and WAS Pump Replacement
Area
Central WWTP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT A <br />SCOPE OF SERVICES <br />PROFESSIONAL ENGINEERING SERVICES <br />FOR <br />RAS AND WAS PUMP REPLACEMENT AT THE CENTRAL WASTEWATER PLANT <br />1 OVERVIEW <br />1.1 Background <br />Indian River County (COUNTY) operates the 4 MGD Central Region Wastewater Treatment Plant. A <br />condition assessment of the facility was recently completed as a part of the COUNTY asset management <br />program. During this assessment it was found that the Return Activated Sludge (RAS) Pumps and Waste <br />Activated Sludge (WAS) Pumps and associated piping and valves were in poor condition due to <br />equipment age and environmental corrosion and are recommended for replacement. The COUNTY has <br />requested a proposal from Arcadis U.S., Inc. (CONSULTANT) to provide professional engineering <br />services for design, phasing plan for operations and bidding, and limited construction administration <br />services. <br />The proposed work will be authorized as a task order under the existing General Professional Services <br />Agreement, between the COUNTY and CONSULTANT, dated February 24, 2017. The terms and <br />conditions of the referenced Contract apply. <br />1.2 Design Concept <br />The general design concept as discussed on a call between COUNTY and CONSULTANT on January 9, <br />2019 is as follows: <br />• Replace existing RAS and WAS Pumps with new pumps of equal capacity and head of the pumps <br />being replaced <br />• Replace existing piping, valves and sensors associated with the RAS and WAS pumps <br />• Replace existing seal water piping at pumps <br />• Develop phasing plan for construction to ensure continued operation <br />• Develop bid documents, provide pre-bid support, and bid recommendation <br />Provide limited construction administration services <br />• Produce record drawings based on contractor supplied "as builts" and conditions observed during <br />site visits <br />
The URL can be used to link to this page
Your browser does not support the video tag.