2019-046D
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-046D
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 12:20:21 PM
Creation date
4/16/2019 1:41:57 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
03/26/2019
Control Number
2019-046D
Agenda Item Number
8.L.
Entity Name
Arcadis US
Subject
Work Order 1, RAS and WAS Pump Replacement
Area
Central WWTP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 SCOPE OF WORK <br />2.1 Task 1 - Project Management <br />The CONSULTANT will provide the following services throughout the duration of the project as needed: <br />Coordination between CONSULTANT Project Team and COUNTY Project Team. <br />Manage project schedule and budget. <br />Prepare and distribute agendas and support documentation for project meetings and workshops. <br />Prepare and distribute meeting summaries from project meetings and workshops. <br />Prepare and submit monthly progress reports and invoices. <br />Preparation and implementation of Quality Control Plan and CAD Plan <br />Deliverables: <br />Meeting Summaries <br />Monthly Progress Reports <br />• Monthly Invoices <br />2.2 Task 2 -Project Kickoff and Site Visit <br />CONSULTANT shall prepare and lead one project kickoff meeting with appropriate COUNTY staff to <br />review the scope of work, project schedule, data needs and key milestones. Prior to the kickoff meeting, <br />CONSULTANT will submit a proposed agenda that will include: (1) items to be discussed, (2) specific <br />questions to be answered, and (3) additional data requests. <br />Immediately following the project kickoff meeting, CONSULTANT and COUNTY will conduct a <br />walkthrough of the RAS/WAS Pumps to gather necessary information on the system configuration and <br />operation. The team will obtain input on the design, operational and maintenance issues, and will <br />interview staff to identify RAS/WAS system constraints and requirements. <br />2.3 Task 3 - Basis of Design <br />2.3.1 Draft Preliminary Design Technical Memorandum <br />Utilizing information obtained from the kickoff meeting, site visit and data provided by the OWNER, <br />CONSULTANT will assess and confirm the limits of the replacement needs for the associated piping, <br />valves, wiring and appurtenances associated with the RAS/WAS Pumps. CONSULTANT will review <br />available information on the existing RAS/WAS Pumps, including as -built drawings, equipment cut sheets, <br />and historical operating data to establish replacement requirements for the new pumps. As part of this <br />assessment, CONSULTANT will identify up to three suitable pump/motor manufacturers that can meet the <br />