My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-046D
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-046D
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 12:20:21 PM
Creation date
4/16/2019 1:41:57 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
03/26/2019
Control Number
2019-046D
Agenda Item Number
8.L.
Entity Name
Arcadis US
Subject
Work Order 1, RAS and WAS Pump Replacement
Area
Central WWTP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
performance and retrofit requirements to replace the existing pumps within the existing site with minimal <br />modifications and have the manufacturer provide a list of installations of their equipment within Florida. <br />CONSULTANT will develop concept level construction costs for the replacement of the pumps along with <br />a preliminary construction schedule and phasing plan that will allow for construction/replacement work to <br />occur while the Central Wastewater Plant is maintained in service. <br />CONSULTANT will prepare a draft Preliminary Design Technical Memorandum summarizing the findings <br />and recommendations of the pump replacement assessment. The memorandum will be submitted to the <br />COUNTY for review and comment. An electronic copy (.pdf) of the draft memorandum will be submitted <br />to the COUNTY. <br />Task 2.3.2 Meeting to Review Draft Technical Memorandum <br />Within about two weeks after the draft technical memorandum submittal, CONSULTANT will lead a <br />meeting with the COUNTY to review the information presented in the memorandum and gather OWNER <br />comments. The meeting will serve as an open forum to discuss preliminary design issues, including <br />equipment preferences. <br />Task 2.3.3 Final Preliminary Design Technical Memorandum <br />Upon receiving comments at the review meeting, CONSULTANT will finalize the preliminary design <br />recommendations and prepare and submit a Final Preliminary Design Technical Memorandum. An <br />electronic copy (.pdf) of the final memorandum will be submitted to the COUNTY. <br />2.4 Task 4 — Detailed Design <br />Based upon the recommendations presented in the Preliminary Design Technical Memorandum, the <br />CONSULTANT will develop design documents. These design documents will consist of Contract <br />Drawings and Technical Specifications and will be incorporated by the COUNTY into a bid package for <br />public procurement. The COUNTY'S Standard "front end" documents consisting of General Conditions <br />will be utilized. Contract Drawings will be prepared in AutoCAD 2018 or later version. Technical <br />Specifications will follow the MasterFormat® 2016 from the Construction Specifications Institute (CSI). <br />The Final Design will be delivered at two stages of completion to allow for input by the COUNTY. The <br />stages will be 90% and 100%/Bid Ready. At each stage, an engineer's opinion of probable construction <br />cost (EOPCC) will be provided. <br />
The URL can be used to link to this page
Your browser does not support the video tag.