My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-046D
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-046D
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 12:20:21 PM
Creation date
4/16/2019 1:41:57 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
03/26/2019
Control Number
2019-046D
Agenda Item Number
8.L.
Entity Name
Arcadis US
Subject
Work Order 1, RAS and WAS Pump Replacement
Area
Central WWTP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.4.1 90% Design <br />CONSULTANT will prepare a 90% design submittal composed of contract drawings (11"x 17") and draft <br />technical specifications and bid form. Five hard copies of the 90% design package and one electronic <br />copy will be submitted to the COUNTY for review. <br />2.4.2 90% Design Submittal Review Meeting <br />CONSULTANT will prepare and lead one meeting to review the 90% design submittal and discuss <br />COUNTY comments within about two weeks after the submittal of the 90% contract documents. <br />CONSULTANT will prepare and distribute a meeting agenda and minutes documenting comments and <br />action items from the design review meeting. <br />2.4.3 100% Design/Bid submittal <br />Based on the comments received from the COUNTY on the 90% design submittal, CONSULTANT will <br />prepare a 100%/Bid design submittal composed of contract drawings (11" x 17") and final technical <br />specifications and bid form. CONSULTANT will provide five hard copies and an electronic copy in .pdf <br />format of the final specifications and plans. <br />2.4.4 Construction Cost Estimates and Schedule <br />An opinion of probable construction costs and schedule will be prepared for each of the 90% and 100% <br />(final opinion of construction cost) submittals. The opinion of construction costs will utilize appropriate <br />contingency factors for the level of completion at the various design stages. <br />2.4.5 QA/QC <br />Quality Assurance/Quality Control: The CONSULTANT will provide quality assurance and quality control <br />(QA/QC) reviews at each major milestone deliverable (90%) of the project. For this service, the <br />CONSULTANT will utilize the services of senior and/or experienced professional engineers across the <br />disciplines represented in the design. The professionals, who will make up the QA/QC Team, will <br />purposely be staff not routinely engaged in the project. The QA/QC Team will prepare written comments <br />at the appropriate stages of the design that will be incorporated into revised documents. <br />2.5 Task 5 - Bidding Services <br />The COUNTY will procure services from a qualified General Contractor (GC) through a public <br />procurement process. The CONSULTANT will provide the following services in connection with the public <br />procurement: <br />Attend a pre-bid meeting and site visit. COUNTY to prepare and publish all addenda and <br />clarifications. <br />
The URL can be used to link to this page
Your browser does not support the video tag.