My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-046D
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-046D
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 12:20:21 PM
Creation date
4/16/2019 1:41:57 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
03/26/2019
Control Number
2019-046D
Agenda Item Number
8.L.
Entity Name
Arcadis US
Subject
Work Order 1, RAS and WAS Pump Replacement
Area
Central WWTP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Final TM 30 88 21 -Jun -19 <br />90% Submittal <br />60 148 20 -Aug -19 <br />County Review 14 162 3 -Sep -19 <br />100%/Bid Ready <br />Submittal <br />21 183 <br />24 -Sep -19 <br />Bidding Services As needed <br />Construction As needed (estimated 6 <br />Management Services months of construction) <br />4 COMPENSATION AND METHOD OF PAYMENT <br />The compensation to be paid to the CONSULTANT for providing the services described in the above scope <br />of work will be on a "lump sum by task" basis as described in the breakdown provided in the Attached Fee <br />Schedule. The lump sum compensation for labor services shall not exceed $66,523. The CONSULTANT <br />may adjust budget between tasks as needed, if the total lump sum is not exceeded. <br />The CONSULTANT will submit invoices to the COUNTY's Project Manager for work performed during <br />each calendar month. Invoicing will be accompanied by a brief description of the work effort completed <br />during the billing period. <br />5 ASSUMPTIONS/EXCLUSIONS <br />The following text describes the assumptions made in the creation of this scope of services and the <br />estimated engineering services fee for this project. Should the scope of the work of the project exceed these <br />assumptions, the CONSULTANT may request additional fees. Assumptions include: <br />• No permits are required <br />• The COUNTY will provide available record drawing of the existing facilities <br />• Resident Inspection will be performed by the COUNTY or another designated representative. <br />• Verification of construction activities will be performed by the COUNTY or other designated <br />representative. <br />• Construction and field reports will be developed by the COUNTY or other designated <br />representative. <br />
The URL can be used to link to this page
Your browser does not support the video tag.