The CONSULTANT shall also receive and respond to contractor Requests for Information (RFI) or request <br />for clarification of the contract documents or design intent. The CONSULTANT <br />2.6.3 Startup Assistance <br />The CONSULTANT shall assist the OWNER and the contractor during checkout, startup and <br />commissioning. It is anticipated that installation, startup and acceptance will be completed one pump at a <br />time to ensure the facility can remain operational throughout construction. CONSULTANT startup and <br />testing assistance will include presence at startup testing; providing technical guidance during operational <br />confirmation and acceptance testing; and reviewing test data. The CONSULTANT shall be available for a <br />one four-hour day for startup and testing. <br />Review of Contractor Pay Applications is not included in this scope of services. <br />2.7 Task 8 — Post -Construction Activities <br />The CONSULTANT will provide the following services during and subsequent to the completion of the <br />construction: <br />2.7.1 Record Drawings: <br />CONSULTANT will prepare final record drawings from the Contractor supplied "as -built" information. The <br />CONSULTANT provide COUNTY with one PDF set. <br />3 SCHEDULE <br />A preliminary schedule of the work (calendar days from notice to proceed) is summarized below. The <br />schedule is based upon a notice to proceed (NTP) date of February 8, 2019. <br />Table 3. Preliminary Schedule <br />Milestone <br />Calendar Days to <br />Complete Task <br />Completion Date <br />(Calendar Days from <br />NTP) <br />Completion Date <br />Notice to Proceed (NTP 25 -Mar -1 <br />Kick-off <br />Draft TM <br />14 <br />14 <br />30 <br />44 <br />County Review <br />14 <br />58 <br />8 -Apr -19 <br />8 -May -19 <br />22 -May -19 <br />