My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-046D
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-046D
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 12:20:21 PM
Creation date
4/16/2019 1:41:57 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
03/26/2019
Control Number
2019-046D
Agenda Item Number
8.L.
Entity Name
Arcadis US
Subject
Work Order 1, RAS and WAS Pump Replacement
Area
Central WWTP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The CONSULTANT shall also receive and respond to contractor Requests for Information (RFI) or request <br />for clarification of the contract documents or design intent. The CONSULTANT <br />2.6.3 Startup Assistance <br />The CONSULTANT shall assist the OWNER and the contractor during checkout, startup and <br />commissioning. It is anticipated that installation, startup and acceptance will be completed one pump at a <br />time to ensure the facility can remain operational throughout construction. CONSULTANT startup and <br />testing assistance will include presence at startup testing; providing technical guidance during operational <br />confirmation and acceptance testing; and reviewing test data. The CONSULTANT shall be available for a <br />one four-hour day for startup and testing. <br />Review of Contractor Pay Applications is not included in this scope of services. <br />2.7 Task 8 — Post -Construction Activities <br />The CONSULTANT will provide the following services during and subsequent to the completion of the <br />construction: <br />2.7.1 Record Drawings: <br />CONSULTANT will prepare final record drawings from the Contractor supplied "as -built" information. The <br />CONSULTANT provide COUNTY with one PDF set. <br />3 SCHEDULE <br />A preliminary schedule of the work (calendar days from notice to proceed) is summarized below. The <br />schedule is based upon a notice to proceed (NTP) date of February 8, 2019. <br />Table 3. Preliminary Schedule <br />Milestone <br />Calendar Days to <br />Complete Task <br />Completion Date <br />(Calendar Days from <br />NTP) <br />Completion Date <br />Notice to Proceed (NTP 25 -Mar -1 <br />Kick-off <br />Draft TM <br />14 <br />14 <br />30 <br />44 <br />County Review <br />14 <br />58 <br />8 -Apr -19 <br />8 -May -19 <br />22 -May -19 <br />