My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-064C
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-064C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 12:59:57 PM
Creation date
4/23/2019 2:09:14 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Report
Approved Date
04/19/2019
Control Number
2019-064C
Agenda Item Number
9.A. (1 of 2)
Entity Name
Clerk of Circuit Court & Comptroller
Subject
Comprehensive Annual Financial Report
Note: Only Electronic Copy on File
Area
Fiscal Year 2017-2018
Alternate Name
CAFR
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Long Term Financial Planning and Major Initiatives <br />Chapter 163 Florida Statutes and Florida Administrative Code Rule 9J-5 requires each local government <br />to have a Comprehensive Land Use Plan. An important part of this plan is the Capital Improvements <br />Plan (CIP) which evaluates the need for public facilities in support of the Future Land Use Element, to <br />estimate the costs of improvements for which local government has fiscal responsibility, to analyze the <br />fiscal capacity of the local government to finance and construct improvements, and to adopt financial <br />policies to guide the funding and construction of the improvements. The CIP is updated annually and <br />encompasses a period of five years. Listed below are some major projects included in the current CIP <br />along with the source of funding and estimated costs: <br />• Osprey Acres Floway and Nature Preserve - The 83.14 acres of undeveloped land purchased east of <br />Osprey Marsh Treatment Facility will serve to create a pollutant removal system (stormwater park) <br />that will remove nitrogen and phosphorus from Osprey Marsh's outflow water and increase the <br />County's ability to meet proposed total maximum daily loads ("TMDL") for nutrients discharged <br />into the Indian River Lagoon. The cost for construction is estimated at $7 5 million and will be <br />funded with a Florida Department of Environmental Protection TMDL Grant, St. John's River Water <br />Management District Cost -Share Grant, Florida House Appropriations Grant and optional one cent <br />sales tax. <br />• North County Commercial Septic to Sewer - The $3 million project will construct a gravity sewer <br />system to service an area that has a land use designation of commercial properties on septic. The <br />area currently has thirty eight (38) existing structures with a total of sixty one (61) parcels. Indian <br />River County Department of Utility Services is constructing a new gravity sanitary sewer system and <br />sections of water main to serve commercial areas along US Highway #1 and in the City of Sebastian. <br />Customer assessments, optional one cent sales tax and a St. John's River Water Management District <br />Cost -Share Grant will provide the funding. <br />• South County Water Treatment Plant Well Construction and Rehabilitation - The Indian River <br />County Department of Utility Services currently owns and operates six (#1-6) Floridan supply wells <br />that are the source water for the South County Reverse Osmosis Water Treatment Facility. This <br />project consists of the construction of a new well #7, the rehabilitation of wells #2, #3 and #5 and the <br />replacement of well #4 at a cost of $3 million from the Utilities operating fund. <br />• 800 Mhz P25 Radio System Migration Project - To meet current operational standards, the 800 Mhz <br />radio system will migrate to the Federal Communications Commission recommended Project 25 <br />(P25) which is the standard for the design and manufacture of interoperable digital two way <br />communications for public safety organizations. The $5.9 million phased upgrade of the system <br />over a five year period will be funded from optional one cent sales tax. <br />• 58th Avenue Resurfacing from 25th Street to 49th Street — The $2.8 million proposed improvements to <br />58th Avenue from north of 26th Street to south of 49th Street consist of reconstruction the roadway <br />utilized full depth reclamation, milling and resurfacing, widening the existing shoulders to 5 -feet, <br />structural asphalt, surface asphalt, minor drainage improvements, utility adjustments, signage, and <br />pavement markings. This project is a Florida Department of Transportation Small County Outreach <br />Program funded project. <br />• Landfill Expansion and Partial Closure — The construction of Cell 2 of Segment 3 (approximately <br />10.6 acres in size), partial closure of Segment 2 (approximately 25 acres in size) and expansion of <br />the landfill gas system is underway at a cost of approximately $16 million. <br />iv <br />
The URL can be used to link to this page
Your browser does not support the video tag.