My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-061A
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-061A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 12:38:11 PM
Creation date
4/26/2019 1:10:04 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
04/09/2019
Control Number
2019-060A
Agenda Item Number
8.D.
Entity Name
Vero Beach Roofing
Subject
Reverse Osmosis Plant Roof Replacement
Area
North Reverse Osmosis Plant
Project Number
IRC-1802
Bid Number
2019031
Alternate Name
RO Plant
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SC -13.07 Correction Period <br />SC -13.07 A. Delete the first sentence of paragraph GC -13.07.A in its entirety and insert the <br />following sentence in its place <br />A. If within one year after the date of Final Completion or such longer period of time <br />as may be prescribed by Laws or Regulations or by the terms of any applicable <br />special guarantee required by the Contract Documents or by any specific provision <br />of the Contract Documents, any Work is found to be defective, or if the repair of <br />any damages to the land or areas made available for CONTRACTOR's use by <br />OWNER or permitted by Laws and Regulations as contemplated in paragraph <br />6.11.A is found to be defective, CONTRACTOR shall promptly, without cost to <br />OWNER and in accordance with OWNER's written instructions: (i) repair such <br />defective land or areas, or (ii) correct such defective Work or, if the defective Work <br />has been rejected by OWNER, remove it from the Project and replace it with Work <br />that is not defective, and (iii) satisfactorily correct or repair or remove and replace <br />any damage to other Work, to the work of others or other land or areas resulting <br />therefrom. <br />SC -13.07 B. Delete paragraph GC -13.07.8 in its entirety and insert the following sentence in its <br />place <br />In special circumstances where a particular item of equipment is placed in continu- <br />ous service before Final Completion of all the Work, the correction period for that <br />item may start to run from an earlier date if so provided in the Specifications or by <br />Written Amendment. <br />SC -14.02 Progress Payments <br />SC -14.02.6.5. Delete paragraph GC -14.02.8.5.d in its entirety and insert the following paragraph <br />in its place: <br />d. ENGINEER has actual knowledge of the occurrence of any of the events <br />enumerated in paragraph 15.02.A; or <br />SC -14.02.6.5. Add the following sentences at the end of paragraph GC -14.02.8.5: <br />e. OWNER has been required to pay ENGINEER additional compensation because <br />of CONTRACTOR delays or rejection of defective Work; or <br />f. OWNER has been required to pay an independent testing laboratory for <br />subsequent inspections, tests, or approvals taken after initial failing inspections, <br />tests, or approvals. <br />SC -14.02.C.1. Delete paragraph GC -14.02.C.1 in its entirety and insert the following <br />paragraph in its place: <br />C. Payment Becomes Due <br />1. Payment shall be made by OWNER to CONTRACTOR according to the Local <br />Government Prompt Payment Act. F.S. 218.70 et. seq. <br />00800-8 <br />00800 - Supplementary Conditions 05-13 rev <br />00800 8F:\Public Works\ENGINEERING DIVISION PROJECTS \1362-01d Dixie Hwy_Highland Dr11-Admin\Bid Documents\Master Contract Documents\00800 - <br />Supplementary Conditions 05-13 rev.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.