My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-061A
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-061A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 12:38:11 PM
Creation date
4/26/2019 1:10:04 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
04/09/2019
Control Number
2019-060A
Agenda Item Number
8.D.
Entity Name
Vero Beach Roofing
Subject
Reverse Osmosis Plant Roof Replacement
Area
North Reverse Osmosis Plant
Project Number
IRC-1802
Bid Number
2019031
Alternate Name
RO Plant
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SC -14.04 Substantial Completion <br />SC -14.04A. After the third sentence in paragraph GC -14.04A of the General Conditions, <br />delete the remainder of paragraph 14.04A in its entirety and replace with the following: <br />"If Engineer considers the Work substantially complete, Engineer will prepare <br />and deliver to Owner a tentative certificate of Substantial Completion that shall fix <br />the date of Substantial Completion. In accordance with the provisions of Florida <br />Statutes section 208.735(7)(a)(2005), upon receipt of the tentative certificate of <br />Substantial Completion from Engineer, the Owner, the Engineer, and the <br />Contractor shall conduct a walk-through inspection of the Project to document a <br />list of any items required to render the Work on the Project complete, <br />satisfactory, and acceptable under this Agreement (herein the "Statutory List"). <br />The Statutory List shall be reduced to writing and circulated among the Owner, <br />the Engineer, and the Contractor by the Owner or the Engineer within 30 <br />calendar days after substantial completion. The Owner and Contractor <br />acknowledge and agree that: 1) the failure to include any corrective work, or <br />pending items that are not yet completed, on the Statutory List does not alter the <br />responsibility of the Contractor to complete all of the Work under this Agreement; <br />2) upon completion of all items on the Statutory List, the Contractor may submit a <br />pay request for all remaining retainage except as otherwise set forth in this <br />Agreement; and 3) any and all items that require correction under this Agreement <br />and that are identified after the preparation of the Statutory List remain the <br />obligation of the Contractor to complete to the Owner's satisfaction under this <br />Agreement. After receipt of the Statutory List by the Contractor, the Contractor <br />acknowledges and agrees that it will diligently proceed to complete all items on <br />the Statutory List and schedule a final walk-through in anticipation of final <br />completion on the Project." <br />SC -14.04B Add the following new paragraph immediately after paragraph GC 14.04B: <br />C. At the time of delivery of the tentative certificate of Substantial Completion, Engineer will <br />deliver to Owner and Contractor a written recommendation as to division of responsibilities <br />pending final payment between Owner and Contractor with respect to security, operation, <br />safety, and protection of the Work, maintenance, heat, utilities, insurance, and warranties and <br />guarantees <br />SC -14.07 Final Payment <br />SC -14.07.C.1. Delete paragraph GC -14.07.C. 1 in its entirety and insert the following <br />paragraph in its place: <br />C. Payment Becomes Due <br />1. Payment shall be made by OWNER to CONTRACTOR according to the " Local <br />Government Prompt Payment Act", Florida Statutes section 218.70, et. seq. <br />SC -15.01 OWNER May Suspend Work <br />SC -15.01.A Delete the last sentence in paragraph GC -15.01.A and insert the following in its <br />place: <br />CONTRACTOR shall be allowed an extension of the Contract Times, directly attributable to any <br />such suspension if CONTRACTOR makes a Claim for an extension as provided in paragraph <br />10.05. CONTRACTOR shall not be allowed an adjustment of the Contract Price and <br />00800-9 <br />00800 - Supplementary Conditions 05-13 rev <br />00800 9F:\Public Works\ENGINEERING DIVISION PROJECTS\1362-OId Dixie Hwy_Highland Dr\1-Admin\Bid Documents\Master Contract Documents\00800 - <br />Supplementary Conditions 05-13 rev.doc <br />