My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-061A
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-061A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 12:38:11 PM
Creation date
4/26/2019 1:10:04 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
04/09/2019
Control Number
2019-060A
Agenda Item Number
8.D.
Entity Name
Vero Beach Roofing
Subject
Reverse Osmosis Plant Roof Replacement
Area
North Reverse Osmosis Plant
Project Number
IRC-1802
Bid Number
2019031
Alternate Name
RO Plant
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01050 <br />FIELD ENGINEERING AND LAYOUT <br />1.1 GENERAL <br />A: The CONTRACTOR will furnish all construction staking for the project. All <br />staking from, control will be under the supervision of a Florida Registered Land <br />Surveyor. <br />B. Develop and make all detail surveys and measurements needed for <br />construction including but not limited to, slope stakes, batter boards, piling <br />layouts and all other working lines, elevations and cut sheets. <br />C. Keep a transit and leveling instrument on the site at all times and a skilled <br />instrument man available whenever necessary for layout of the Work. <br />D. Provide all material required for benchmarks, control points, batter boards, <br />grade stakes, and other items. <br />E. Be solely responsible for all locations, dimensions and levels. No data other <br />than written orders of the ENGINEER shall justify departure from the <br />dimensions and levels required by the Drawings. <br />F. Safeguard all points, stakes, grademarks, monuments and benchmarks made <br />or established on the Work, and reestablish same, if disturbed. Rectify all <br />Work improperly installed because of not maintaining, not protecting or <br />removing without authorization such established points, stakes, marks and <br />monuments. <br />G. When requested by the ENGINEER, provide such facilities and assistance as <br />may be necessary for the ENGINEER to check line and grade points placed by <br />the CONTRACTOR. Do no excavation or embankment work until all <br />cross -sectioning necessary for determining pay quantities has been completed <br />and checked by the ENGINEER. <br />H. The cost of performing engineering and layout work described above shall be <br />included in the contract unit prices for the various items of work to which it is <br />incidental. No separate payment will be made for surveying or engineering. <br />1.2 SURVEY WORK AND QUALIFICATIONS OF SURVEYOR <br />A. Prior to commencing work, the CONTRACTOR shall satisfy himself as to the <br />accuracy of all survey and existing site information as indicated in the Contract <br />Documents. Immediately notify the ENGINEER upon discovery of any errors, <br />inaccuracies or omissions in the survey data. The commencing of any of the <br />work by the CONTRACTOR shall be held as the CONTRACTOR's acceptance <br />that all survey or existing site information is correct and accurate, without any <br />reasonably inferable errors, inaccuracies or omissions. <br />1050-1 01050 Field Engineering <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1362-Old Dixie Hwy_Highland Dr\1-Admin\Bid Documents\Master Contract Documents\01050-- Field Engineering.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.