My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-061A
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-061A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 12:38:11 PM
Creation date
4/26/2019 1:10:04 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
04/09/2019
Control Number
2019-060A
Agenda Item Number
8.D.
Entity Name
Vero Beach Roofing
Subject
Reverse Osmosis Plant Roof Replacement
Area
North Reverse Osmosis Plant
Project Number
IRC-1802
Bid Number
2019031
Alternate Name
RO Plant
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. The CONTRACTOR shall carefully preserve all control stakes, benchmarks, <br />reference points and property corners and will be responsible for any mistake <br />or Toss of time caused by their unnecessary loss or disturbance. If the loss or <br />disturbance of the stakes or marks cause a delay in the Work, the <br />CONTRACTOR shall have no claim for damages or extension of time. Control <br />stakes, benchmarks, reference points and property corners disturbed by the <br />CONTRACTOR's work shall be replaced by a Florida Registered Land Sur- <br />veyor and Mapper, at the CONTRACTOR's expense. In the event the Owner <br />must provide the services of the Florida Registered Surveyor and Mapper to <br />perform this replacement work, the cost of the surveying services will be <br />deducted from any sums due the CONTRACTOR for the work performed under <br />this Contract. <br />C. All survey work shall be performed under the guidance and direction of a <br />Florida Registered Surveyor and Mapper. <br />D. All survey work for Record Drawings shall be performed by a Florida Registered <br />Surveyor and Mapper. <br />1.3 STATION BOARDS <br />A. CONTRACTOR shall erect and maintain white/black standard FDOT station <br />markers every 100 feet. <br />1.4 LAYOUT OF STRIPING <br />Establish by instrument, and mark the finished surface, the points necessary for <br />striping finished roadway in conformance with Section 5-7 of FDOT Standard <br />Specifications. <br />+ + END OF SECTION + + <br />1050-2 01050 Field Engineering <br />F:\Public Works\ENGINEERING DIVISION PROJECTS \1362 -Old Dixie Hwy_Highland Dr\1-Admin\Bid Documents Master Contract Documents \01050 - Field Engineering.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.