My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-061A
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-061A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 12:38:11 PM
Creation date
4/26/2019 1:10:04 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
04/09/2019
Control Number
2019-060A
Agenda Item Number
8.D.
Entity Name
Vero Beach Roofing
Subject
Reverse Osmosis Plant Roof Replacement
Area
North Reverse Osmosis Plant
Project Number
IRC-1802
Bid Number
2019031
Alternate Name
RO Plant
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. Submit project specific plan for abandonment at least 15 days prior to <br />commencing grouting activities, describe proposed sequence and other <br />information pertinent to completion of Work. <br />3. MATERIALS <br />A. Cement -based grout/ flowable fill with self -leveling and non -shrink <br />characteristics. <br />B. Unconfined compressive strength: Minimum 100 psi at 56 days as <br />determined based on average of three tests for same placement. <br />Present at least three acceptable strength tests for proposed mix <br />design in mix design report. <br />4. CONSTRUCTION <br />Abandoning and grouting of water lines must not occur until all existing water mains and <br />services have been transferred to a relocated water line or another line as designated in the <br />Contract Documents. The Contractor will be responsible for the satisfactory coordination of <br />the pipe abandonments with other construction and activities in the area. Delays in work <br />resulting from lack of coordination will not be cause for additional compensation. Any work <br />involving or impacting asbestos concrete pipe must be in accordance with the procedures <br />outlined in the approved specifications for this project and will comply with all federal, state, <br />and local laws, ordinances and regulations regarding the management of asbestos <br />containing materials. <br />Remove all water line appurtenances, such as hydrants, valves and valve casing and <br />castings. These appurtenances must be returned to the designated utility representative. <br />Make cuts, install bulkheads, vents to allow for air release. <br />Remove any free-standing water prior to starting fill replacement. <br />Place grout/flowable fill using concrete or grout pumps capable of continuous delivery at <br />planned placement rate to fill volume between placement points not to exceed 500 linear ft. <br />at a time. Pump flowable fill through bulkheads constructed for placement of PVC pipes or <br />other methods to contain grout in line to be abandoned. These pipes will be used for <br />injection points or vents during placement. Place grout under pressure into property <br />vented open system until grout emerges from vent pipes indicating pipe is completely filled. <br />Pumping grout must be completed under sufficient pressure to overcome friction and to fill <br />water main from downstream to upstream end. Remediate areas where flowable fill did not <br />fill voids in water main by pressure grouting from inside water main or from surface if <br />necessary. Plug each end of the water main being abandoned. Ensure that concrete is <br />around plug/bulkhead and around pipe including bedding area such that it is not penetrable <br />by groundwater and that bedding at this location is not a conduit for groundwater. The <br />01025-38 Technical Specifications <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1362-OId Dixie Hwy_Highland Dr\1-Admin\Bid Documents\Master Contract <br />Documents\Technical Specifications.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.