My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-061B
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-061B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 12:49:18 PM
Creation date
4/26/2019 1:52:57 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
04/09/2019
Control Number
2019-061B
Agenda Item Number
8.H.
Subject
Wabasso Causeway Fishing Pier Demolition Project
Project Number
IRC-1712
Bid Number
2019035
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
468
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
m <br />0 <br />0 <br />a <br />E <br />co0 <br />u) <br />rn <br />0 <br />N <br />10 <br />0 <br />0 <br />Time: Wednes <br />w <br />x <br />0 <br />Pier\Justin Files\CAD <br />• ALL PIER REMOVAL OPERATIONS SHALL BE CONTAINED <br />WITHIN WATER QUALITY BMPS SUCH AS, BUT NOT LIMITED <br />TO, TURBIDITY BARRIERS AND SILT FENCES. <br />• PIER COMPONENTS SHALL BE LIFTED STRAIGHT UP AND NOT <br />DRAGGED, SO THAT ANY POTENTIAL SEAGRASS AND/OR <br />HARDBOTTOM IS NOT DAMAGED. <br />• AT ALL TIMES, A MINIMUM 1 FOOT VERTICAL CLEARANCE <br />BETWEEN THE KEEL OR LOWEST PORTION OF THE VESSEL <br />RUNNING GEAR AND THE BOTTOM OF THE WATERWAY SHALL <br />BE MAINTAINED. <br />• WORK SHALL COMPLY WITH STANDARD MANATEE <br />CONDITION FOR IN -WATER WORK. THE CONTRACTOR SHALL <br />COMPLY WITH THE FOLLOWING CONDITIONS INTENDED TO <br />PROTECT MANATEES FROM DIRECT PROJECT EFFECTS: <br />7.1. ALL PERSONNEL ASSOCIATED WITH THE PROJECT SHALL <br />BE INSTRUCTED ABOUT THE PRESENCE OF MANATEES <br />AND MANATEE SPEED ZONES, AND THE NEED TO AVOID <br />COLLISIONS WITH AND INJURY TO MANATEES. THE <br />CONTRACTOR SHALL ADVISE ALL CONSTRUCTION <br />PERSONNEL THAT THERE ARE CIVIL AND CRIMINAL <br />PENALTIES FOR HARMING, HARASSING, OR KILLING <br />MANATEES WHICH ARE PROTECTED UNDER THE MARINE <br />MAMMAL PROTECTION ACT, THE ENDANGERED SPECIES <br />ACT, AND THE FLORIDA MANATEE SANCTUARY ACT. <br />7.2. ALL VESSELS ASSOCIATED WITH THE CONSTRUCTION <br />PROJECT SHALL OPERATE AT "IDLE SPEED/NO WAKE" AT <br />ALL TIMES WHILE IN THE IMMEDIATE AREA AND WHILE IN <br />WATER WHERE THE DRAFT OF THE VESSEL PROVIDES <br />LESS THAN A FOUR -FOOT CLEARANCE FROM THE <br />BOTTOM. ALL VESSELS WILL FOLLOW ROUTES OF DEEP <br />WATER WHENEVER POSSIBLE. <br />7.3. SILTATION OR TURBIDITY BARRIERS SHALL BE MADE OF <br />MATERIAL IN WHICH MANATEES CANNOT BECOME <br />ENTANGLED, SHALL BE PROPERLY SECURED, AND SHALL <br />BE REGULARLY MONITORED TO AVOID MANATEE <br />ENTANGLEMENT OR ENTRAPMENT. BARRIERS MUST NOT <br />IMPEDE MANATEE MOVEMENT. <br />7.4. ALL ON-SITE PROJECT PERSONNEL ARE RESPONSIBLE <br />FOR OBSERVING WATER -RELATED ACTIVITES FOR THE <br />PRESENCE OF MANATEE (S) . ALL IN -WATER <br />OPERATIONS, INCLUDING VESSELS, MUST BE SHUTDOWN <br />IF MANATEE (S) COMES WITHIN 50 FEET OF THE <br />OPERATION. ACTIVITIES WILL NOT RESUME UNTIL THE <br />MANATEE (S) HAS MOVED BEYOND THE 50 -FOOT <br />RADIUS OF THE PROJECT OPERATION, OR UNTIL 30 <br />MINUTES ELAPSES IF THE MANATEE (S) HAS NOT <br />REAPPEARED WITHIN 50 FEET OF THE OPERATION. <br />ANIMALS MUST NOT BE HERDED AWAY OR HARASSED <br />INTO LEAVING. <br />7.5. ANY COLLISION WITH OR INJURY TO A MANATEE SHALL <br />BE REPORTED IMMEDIATELY TO THE FLORIDA FISH AND <br />WILDLIFE CONSERVATION COMMISSION ( FWC) <br />HOTLINE AT 1-888-404-3922. COLLISION AND/OR INJURY <br />SHOULD ALSO BE REPORTED TO THE U.S. FISH AND <br />WILDLIFE SERVICE IN JACKSONVILLE (1-904-731-3336) <br />FOR NORTH FLORIDA OR IN VERO BEACH (1-722-562-3909) <br />FOR SOUTH FLORIDA, AND EMAILED TO FWC AT <br />IMPERILEDSPECIES@MYFWC.COM <br />7.6. A TEMPORARY SIGN CONCERNING MANATEES SHALL BE <br />POSTED PRIOR TO AND DURING ALL IN -WATER PROJECT <br />ACTIVITIES. ALL SIGNS ARE TO BE REMOVED BY THE <br />CONTRACTOR UPON COMPLETION OF THE PROJECT. <br />TEMOPORARY SIGNS THAT HAVE ALREADY BEEN <br />APPROVED FOR THIS USE BY THE FWC MUST BE USED. <br />ONE SIGN WHICH READS CAUTION.• BOATERS MUST BE <br />POSTED. A SECOND SIGN MEASURING AT LEAST 8 z " BY <br />11" EXPLAINING THE REQUIREMENTS FOR "IDLE <br />SPEED/NO WAKE" AND THE SHUT DOWN OF IN -WATER <br />OPERATIONS MUST BE POSTED IN A LOCATION <br />PROMINENTLY VISIBLE TO ALL PERSONNEL ENAGAGED IN <br />WATER -RELATED ACTIVITES. THESE SIGNS CAN BE <br />VIEWED AT <br />HTTP://WW W.MYFWC.COMNVI LDLIFEHABITATS/MANTEE <br />_SIGN VENDORS.HTM. <br />QUESTIONS CONCERNING THESE SIGNS CAN BE <br />FORWARDED TO THE EMAIL ADDRESS LISTED ABOVE. <br />8. WORK SHALL COMPLY WITH SEA TURTLE AND SMALLTOOTH <br />SAWFISH CONSTRUCTION CONDITIONS. THE CONTRACTOR <br />SHALL COMPLY WITH THE FOLLOWING PROTECTED SPECIES <br />CONSTRUCTION CONDITIONS: <br />8.1. THE CONTRACTOR SHALL INSTRUCT ALL PERSONNEL <br />ASSOCIATED WITH THE PROJECT OF THE POTENTIAL <br />PRESENCE OF THESE SPECIES AND THE NEED TO AVOID <br />COLLISIONS WITH SEA TURTLES AND SMALLTOOTH <br />SAWFISH. ALL CONSTRUCTION PERSONNEL ARE <br />RESPONSIBLE FOR OBSERVING WATER -RELATED <br />ACTIVITIES FOR THE PRESENCE OF THESE SPECIES. <br />8.2. THE CONTRACTOR SHALL ADVISE ALL CONSTRUCTION <br />PERSONNEL THAT THERE ARE CIVIL AND CRIMINAL <br />PENALTIES FOR HARMING, HARRASSING, OR KILLING SEA <br />TURTLES OR SMALLTOOTH SAWFISH, WHICH ARE <br />PROTECTED UNDER THE ENDANGERED SPECIES ACT OF <br />1973. <br />8.3. SILTATION BARRIERS SHALL BE MADE OF MATERIAL IN <br />WHICH A SEA TURTLE OR SMALLTOOTH SAWFISH <br />CANNOT BECOME ENTANGLED, BE PROPERLY SECURED, <br />AND BE REGULARLY MONITORED TO AVOID PROTECTED <br />SPECIES ENTRAPMENT. BARRIERS MAY NOT BLOCK SEA <br />TURTLE OR SMALLTOOTH SAWFISH ENTRY TO OR EXIT <br />FROM DESIGNATED CRITICAL HABITAT WITHOUT PRIOR <br />AGREEMENT FROM THE NATIONAL MARINE FISHERIES <br />SERVICE'S PROTECTED RESOURCES DIVISION, ST. <br />PETERSBURG, FLORIDA. <br />8.4. ALL VESSELS ASSOCIATED WITH THE CONSTRUCTION <br />PROJECT SHALL OPERATE AT "NO WAKE/IDLE" SPEEDS <br />AT ALL TIMES WHILE IN THE CONSTRUCTION AREA AND <br />WHILE IN WATER DEPTHS WHERE THE DRAFT OF THE <br />VESSEL PROVIDES LESS THAN A FOUR -FOOT <br />CLEARANCE FROM THE BOTTOM. ALL VESSELS WILL <br />PREFERENTIALLY FOLLOW DEEP -WATER ROUTES ( E.G., <br />MARKED CHANNELS) WHENEVER POSSIBLE. <br />8.5. IF SEA TURTLE OR SMALLTOOTH SAWFISH IS SEEN <br />WITHIN 100 YARDS OF THE ACTIVE DAILY <br />CONSTRUCTION/DREDGING OPERATION OR VESSEL <br />MOVEMENT, ALL APPROPRIATE PRECAUTIONS SHALL BE <br />IMPLEMENTED TO ENSURE ITS PROTECTION. THESE <br />PRECAUTIONS SHALL INCLUDE CESSATION OF <br />OPERATION OF ANY MOVING EQUIPMENT CLOSER THAN <br />50 FEET OF A SEA TURTLE OR SMALLTOOTH SAWFISH. <br />OPERATION OF ANY MECHANICAL CONSTRUCTION <br />EQUIPMENT SHALL CEASE IMMEDIATELY IF A SEA TURTLE <br />OR SMALLTOOTH SAWFISH IS SEEN WITHIN A 50 -FT <br />RADIUS OF THE EQUIPMENT. ACTIVITIES MAY NOT <br />RESUME UNTIL THE PROTECTED SPECIES HAS <br />DEPARTED THE PROJECT AREA OF ITS OWN VOLITION. <br />8.6. ANY COLLISION WITH AND/OR INJURY TO A SEA TURTLE <br />OR SMALLTOOTH SAWFISH SHALL BE REPORTED <br />IMMEDIATELY TO THE NATIONAL MARINE FISHERIES <br />SERVICE'S PROTECTED RESOURCES DIVISION <br />( 727-824-5312) AND THE LOCAL AUTHORIZED SEA <br />TURTLE STRANDING/RESCUE ORGANIZATION. <br />ATKINS <br />7175 Murrell Road <br />Melbourne, Florida 32940 <br />321-242-4942 <br />FBPR Certificate of Authorization No. 24 <br />WABASSO FISHING PIER <br />DEMOLITION AND DEBRIS REMOVAL <br />INDIAN RIVER COUNTY <br />GENERAL NOTES <br />ENGINEER OF RECORD. <br />KBAETH M GOOD, PE <br />UC. NO. 61687 <br />JOB No. <br />100055899 <br />CAD F LE <br />BIM FRAEER <br />G-002 <br />
The URL can be used to link to this page
Your browser does not support the video tag.