Laserfiche WebLink
Page 3 of 3 <br />OPEN DISCUSSION <br />During open discussion the following questions were asked and answered: • <br />1) Will parking be provided or will there be parking fees? Answer — Yes, parking areas just <br />outside of the building and at a large grassy area south of the parking garage, as well as <br />parking spaces in the parking garage, will be made available free of charge. <br />2) Will a tool/equipment inventory or inspection be required? Answer — No, with the <br />temporary walls in place, these will not be required. The Contactor can enter/leave freely <br />through the door made available to each construction area. <br />3) Are there restrictions on Sunday work? Answer — No, not for internal work. <br />4) Are the noise restrictions mostly for the 2"d floor? Answer — Yes, although quiet work will <br />be allowed on the second floor during work hours. Demo/noisy work on the first floor will <br />need to be managed on an ongoing basis. If/when it becomes too loud, work will need to <br />adjusted accordingly. <br />-Building Walk -Through <br />- At 10:31AM, the meeting transitioned from the Law Library to a comprehensive walk- <br />through of the project areas and parking/staging/storage/elevator areas led by Lt. <br />Harrington. <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1728 IRC Courthouse Renovations Project\l-Admin\Meetings\Re-Bid Pre-Bid\1728_PRE- <br />BID Meeting Agenda-Minutes_20190211.doc <br />