My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-060A
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-060A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 12:32:59 PM
Creation date
5/20/2019 1:22:57 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
04/09/2019
Control Number
2019-060A
Agenda Item Number
8.D.
Entity Name
Vero Beach Roofing
Subject
Reverse Osmosis Plant Roof Replacement
Area
North Reverse Osmosis Plant
Project Number
IRC-1802
Bid Number
2019031
Alternate Name
RO Plant
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 3 <br />PROJECT CONSULTANTS: <br />REI Engineers, Inc. <br />OTHER COORDINATION <br />IRC Utilities <br />PROJECT CONSIDERATIONS <br />• Normal work hours (7AM to 5PM), weekend work hours <br />• Portable restroom facilities <br />• Sensitive equipment and hardware located within the building <br />• Lightning Protection —A question was asked regarding testing the existing lightning <br />protection. Testing the lightning protection is not included in this project. <br />• Inspection of project site/building — During a discussion regarding inspection of the <br />building site, County Staff agreed to allow the attendees to visit the site after the Pre -Bid <br />meeting. Future requests to visit the site must be directed to the County Purchasing <br />Division. <br />ADDENDUMS <br />• Provide project related comments and questions to Indian River County Purchasing <br />Division ASAP. Response to comments and questions received within 10 days of the bid <br />opening date may not be considered. <br />DISCUSSION <br />Questions & Answers: <br />Following an introduction and presentation of the project by IRC Infrastructure Project <br />Manager Andy Sobczak, the meeting was opened to questions and comments by the <br />attendees. <br />-The budget for the project was requested by a contractor in attendance. The estimated <br />construction cost for the project is $300,000.00. <br />-A contractor asked for the project timeframe. The timeframe of the Contract is 90 days to <br />Substantial Completion and 120 days to Final Completion. <br />-Andy Sobczak mentioned that the building permit for the project was already applied for and <br />paid for by the County. <br />-A question was asked regarding the replacement of the sole rooftop AC. With this project, <br />we are only looking for replacement of the AC's curb. <br />- A contractor asked if all the roof decks are concrete. Yes, they are all concrete. <br />-A question was asked regarding the ages of the roofs on the different building sections. <br />The roofs are approximately 20 years old over the original section of the building while <br />
The URL can be used to link to this page
Your browser does not support the video tag.