My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-060A
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-060A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 12:32:59 PM
Creation date
5/20/2019 1:22:57 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
04/09/2019
Control Number
2019-060A
Agenda Item Number
8.D.
Entity Name
Vero Beach Roofing
Subject
Reverse Osmosis Plant Roof Replacement
Area
North Reverse Osmosis Plant
Project Number
IRC-1802
Bid Number
2019031
Alternate Name
RO Plant
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Singular words shall be interpreted as plural, and plural words shall be interpreted <br />as singular where applicable as the context of the Contract Documents indicates. <br />2. Imperative mood and streamlined language are generally used in the <br />Specifications. Requirements expressed in the imperative mood are to be <br />performed by Contractor. Occasionally, the indicative or subjunctive mood may <br />be used in the Section Text for clarity to describe responsibilities that must be <br />fulfilled indirectly by Contractor or by others when so noted. <br />a. The words "shall," "shall be," or "shall comply with," depending on the <br />context, are implied where a colon (:) is used within a sentence or phrase. <br />PART 2 PRODUCTS (NOT USED) <br />PART 3 EXECUTION (NOT USED) <br />END OF SECTION 01 11 00 (Revision No. 1) <br />Indian River County North RO Plant <br />Roof Replacement 01 11 00-3 (Revision No. 1) Summary of Work <br />
The URL can be used to link to this page
Your browser does not support the video tag.