Laserfiche WebLink
SECTION 07 22 16 — Revision 1 <br />ROOF INSULATION <br />PART 1 GENERAL <br />1.01 SECTION INCLUDES <br />A. Roof Sections A, B & C: Prepare existing concrete deck and adhere base layer insulation <br />system. Then adhere attach gypsum overlayment. <br />B. Roof Section D & E: Prepare existing concrete deck and adhere R-20 tapered insulation <br />system. Then adhere attach gypsum overlayment. <br />C. Roof Section F: Prepare existing concrete deck and adhere base layer insulation system. <br />Then adhere attach gypsum overlayment. <br />1.02 RELATED DOCUMENTS <br />1. Rough Carpentry Section 06 10 00 <br />2. Preparation for Reroofing Section 07 01 50 <br />3. Thermoplastic Single Ply Roofing Section 07 54 00 <br />1.03 REFERENCES <br />A. Refer to the following references for specification compliance: <br />1. FBC Building Code <br />2. National Roofing Contractors Association — NRCA <br />3. FM Global <br />4. Underwriters Laboratories, Inc. — UL <br />5. ASHRAE Standard 90.1 <br />1.04 DESCRIPTION <br />A. R Value (Roof Sections D & E Only) <br />1 The minimum continuous "R -value" for the above deck insulation system shall be <br />20 and in accordance with the current Energy Conservation Code and ASHRAE <br />90.1. <br />2. R value to be based on Long -Term Thermal Resistance (LTTR) for <br />polyisocyanurate insulation and manufacturer's published data for all other <br />insulation components, as tested in accordance with ASTM C177, C236, C518 or <br />C976. <br />1.05 SUBMITTALS <br />A. Refer to Section 01 33 00 -Submittal Procedures for requirements. <br />B. Manufacturer's Product Data Sheets for all materials specified certifying material complies <br />with all specified requirements. <br />C. Roof insulation plan from material supplier with minimum R -value for roof sections D & <br />E. <br />Indian River County North RO Plant <br />Roof Replacement 07 22 16-1 Revision 1 Roof Lnsulation <br />