My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-078
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-078
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 1:18:33 PM
Creation date
6/3/2019 1:33:04 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/21/2019
Control Number
2019-078
Agenda Item Number
8.C.
Entity Name
Atkins North America, Inc.
Subject
Work Order 3
Area
Wabasso Causeway Fishing Pier Demolition Project
Project Number
IRC-1712
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATKINS <br />2. It is assumed the pedestrian bridge to be demolished is owned by the County, and that coordination <br />with, or approvals from, FDOT will not be required for its removal. <br />3. It is assumed that the demolition work will be managed from the waterside (i.e. a barge) and that no <br />work will be conducted from the highway bridge. If it is determined that work will be done from the <br />highway bridge, coordination and approval from FDOT may be required. Such coordination and <br />approval would be outside this scope of services and would be considered an additional service. <br />4. It is understood that the County obtained regulatory approval for disposal of the pier demolition debris <br />at an offshore location. This work was done by internal County staff. Further, it is understood the <br />County is responsible for any required direction, instruction, inspection, or observation involving <br />transport to the placement site and activities at the placement site. The Engineer's responsibilities <br />concerning the debris will end with the completion of the visual observation described in 5. B. above. <br />5. Seagrass monitoring and reporting is not included with this scope and fee. <br />6. Services associated with regulatory compliance for the offshore reef are not included with this scope. <br />It is assumed that County staff will handle such service since they secured the reef approval directly. <br />Atkins can provide assistance with the reef site as an additional service if requested. <br />7. Only those services specifically mentioned in Section 1 are included with this scope of services. <br />Additional services can be provided at an agreed upon lump sum fee or at the standard hourly rates. <br />8. It is understood there are often unforeseeable conditions and events impacting the progress and cost <br />of construction. No contingency has been provided for within this scope. Effort to address any <br />unforeseen issues will be considered additional services to be negotiated on an as needed basis. <br />Any additional services will require a request for an amendment to this work order to be <br />approved by Indian River County, prior to work being done. <br />SECTION 3 SCHEDULE & DELIVERABLES <br />The schedule for the completion of these service is dependent on, and will follow, the actual construction <br />progress. <br />The following deliverables will be provided to the County: <br />A. Observation reports (provided on a weekly basis) <br />B. Lift plan review summary <br />SECTION 4 COMPENSATION <br />The proposed scope of services will be provided on a time and material not -to -exceed (NTE) basis <br />administered pursuant to the provisions of our master contract dated April 17, 2018, and invoiced monthly. <br />Construction Services (NTE) $ 44,878 <br />Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.