My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-085B
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-085B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 1:19:57 PM
Creation date
6/10/2019 2:21:31 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
06/04/2019
Control Number
2019-085B
Agenda Item Number
8.K.
Entity Name
REI Engineers
Subject
Roof Replacements
Area
Central Wastewater Treatment Plan
Project Number
IRC-1829
Alternate Name
Work Order No. 7
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENGINEERS <br />PROJECT # P19TPA-014 <br />D. Prepare comprehensive scaled drawings for conditions present to ensure competitive bids are <br />received. All plans and details to be developed on Computer Aided Drafting (AutoCAD). <br />E. Prepare technical specifications of the removal or other preparation of the existing roofing <br />system(s) and installation of insulation, roof system(s) and sheet metal for the building. <br />Issue preliminary Contract Documents for Owner review. Upon, acceptance, final Contract <br />Documents will be prepared and submitted. <br />G. Hold one Pre -Bid Meeting for potential contractors to review the Contract Documents and resolve <br />any questions that may arise during the bid stage of the project. <br />Provide addenda as required during the bidding phase. <br />Analyze bids received and provide a recommendation made based on low bid, alternates, <br />contractor's past performance and Owner's budget restrictions. Submit a certified Bid Tabulation <br />and recommendation for award. <br />II. CONSTRUCTION ADMINISTRATION (CA) <br />A. Review and accept, as appropriate, shop drawings and submittals as required by the Contract <br />Documents. Return unacceptable submittals to Owner as required until compliance with <br />specifications is realized. <br />B. According to the tentative bid acceptance, a pre -construction meeting will be held with the <br />successful contractor to ensure a clear understanding of the plans and specifications and review <br />the proposed materials list. <br />C. Monitor the construction once every 5 working days, Monday through Friday only, to verify work <br />completed from previous site visit and to observe work in progress. Photographs will be taken as <br />deemed necessary for documentation. REI cannot comment on work that takes place and is <br />covered while REI is not onsite. <br />Prepare and submit reports relaying information pertaining to weather, area worked, application <br />methods, and material types installed during the site visit. <br />E. Review any change orders developed by the county as needed to address changes to the contract <br />requirements. <br />Upon notification by the owner a substantial completion inspection and a final inspection will be <br />conducted with REI, contractor and Owner personnel. If required, a punch list will be prepared to <br />list any minor items that require further treatment. <br />Conduct a 2 -year Contractor Warranty Inspection before the warranty expires to address warranty <br />issues with the Contractor and Manufacturer. <br />III. PROPOSED SCOPE OF CONSTRUCTION WORK <br />A. Remove existing roof systems down to the existing structural deck and provide new roof systems <br />along with sheet metal flashing and accessories to provide complete, watertight, warrantable roof <br />assemblies. Roof systems selected will be submitted to Owner for approval. <br />Engineering solutions for tomorrow' <br />PAGE 2 OF 4 <br />10150 Highland Manor Drive, Suite 200 reiengineers.com <br />Tampa. FL 33610 813.944.2137 <br />
The URL can be used to link to this page
Your browser does not support the video tag.