My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-085A
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-085A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 1:19:53 PM
Creation date
6/10/2019 2:36:28 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
06/04/2019
Control Number
2019-085A
Agenda Item Number
8.J.
Entity Name
Aptim Environmental
Subject
Dune Restoration Project
Area
Sector 5
Project Number
2018029-4
Alternate Name
Beach Restoration
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APTIM <br />Cost <br />The lump sum cost for this task is $8,904.27. <br />Task 7: Check Surveys <br />May 17, 2019 <br />Page 5 of 6 <br />APTIM will conduct up to two (2) independent check surveys to evaluate discrepancies that may arise between <br />the Contractor's requested pay volume and APTIM's computed pay volume based on the construction plans. This <br />will allow for a prompt, independent check should questions arise regarding the data obtained by the surveyor <br />retained by the Contractor to perform pay surveys. The surveys will be conducted with land-based equipment and <br />extend to sufficient wading depth to complete the data check. <br />Deliverable <br />APTIM will include the check survey cross-sections in the Project Completion Report, if applicable. <br />Schedule <br />A fixed timeline cannot be provided because it is dependent upon the Contractor's progress and pay survey <br />results. APTIM will mobilize in an expeditious manner according to construction progress. <br />Cost <br />The lump sum cost for this task is $6,116.71. <br />Summary <br />The total lump sum cost to perform the proposed work described herein for Sector 5 — 2018029 — Work Order #4 <br />is $241,741.00. Please refer to Exhibit 2, attached to the end of this proposal, for a summary of the costs and labor <br />hours of each Task. APTIM will proceed with the tasks upon receipt of a signed work order from Indian River <br />County (unless stated otherwise in the schedule). It is noted that some aspects of this Work Order are dependent <br />upon Contractor performance and are outside the control of APTIM and the County. As such, the scope, schedule <br />and cost described herein is provided as an estimate. APTIM will strive to execute each phase of the work within <br />budget and in as expeditious a manner according to construction progress. We will coordinate with the County in <br />the event that the scope, schedule, or budget arise due to unforeseen issues or circumstances. <br />Thank you for the opportunity to serve Indian River County. We look forward to continuing to provide expert <br />professional services to the County. Please do not hesitate to call if you have any questions. <br />Sincerely, <br />1717\k)---- <br />Jordon <br />n^y- <br />Jordon Cheifet, PE, CFM <br />Senior Project Engineer <br />Aptim Environmental & Infrastructure, LLC <br />cc: Thomas Pierro, P.E., D.CE, APTIM <br />Authorized Corporate Signature <br />Thomas P. Pierro, P.E., D.CE <br />Printed Name <br />Director of Operations <br />Title <br />
The URL can be used to link to this page
Your browser does not support the video tag.