My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-041
CBCC
>
Resolutions
>
2010's
>
2019
>
2019-041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2019 9:49:05 AM
Creation date
6/17/2019 9:26:16 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
2019-041
Approved Date
06/11/2019
Agenda Item Number
10.A.1.
Resolution Type
Text Amendments to Comprehensive Plan 2030 for approval purposes
Entity Name
Indian River County Comprehensive Plan 2030
Subject
Proposed amendments to Transportation and Capital Improvements sent for approval before adopting
Document Relationships
2019-090
(Cover Page)
Path:
\Official Documents\2010's\2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Comprehensive Plan Transportation Element <br /> - r_- F <br /> terms,the 1,522 crashes resulted in a rate of.012. Approximately 2%of all crashes in 2005 resulted <br /> in a fatality. <br /> 2030-2040 Long Range Transportation Plan <br /> In 20052015, the MPO completed its 2030-2040 Long Range Transportation Plan (LRTP) update. <br /> As was the case in previous plans, the MPO identified both future deficiencies on the road <br /> network and a cost affordable set of improvements needed to accommodate future demand. <br /> According to the 2030 2040 LRTP, the vast majority of roadways are expected to operate at LOS <br /> "D" or better in 20342040, with the majority actually operating at LOS "B" or above. A small <br /> number of roadways, however, are expected to operate below LOS "D." These are shown on <br /> Table 4.7 and include Indian River Boulevard (Merrill Barber Bridge — Royal Palm Point); SR <br /> AlA (17th Street — Vero Beach City Limits); parts of US 1 in the City of Sebastian and in the <br /> City of Vero Beach; and the Wabasso Causeway. <br /> In the course of developing the 2030 2040 LRTP update, the MPO identified roadway projects <br /> that were underway or expected to be completed within five years of adoption of the LRTP. <br /> These projects, known as committed roadway projects, were added to the inventory of existing <br /> roadway projects in Indian River County to form the Existing plus Committed (E+C) roadway <br /> network. The E+C roadway network deficiencies can be found in Table 1 and in Figure 4.2, <br /> while proposed new roadway improvement projects can be found in Figure 4.8. <br /> In the 2030 2040 Cost Feasible Plan, major planned roadway improvements include—the <br /> - : • - • . - • :t • . . :d► <br /> ► - Avenue (26th Street t.. r <br /> : s .. • '.. ..• : : . - .. . construction of a new interchange at Oslo Road <br /> and 1-95;the widening of 66th Avenue(49th Street—CR 510); the widening of CR 510(CR 512— <br /> 66th Avenue);the construction of 82"d Avenue(69th Street—CR 510); the widening of Oslo Road <br /> (58th Avenue —1-95); the widening of US 1 (53rd Street=CR 510); and the construction of 82"d <br /> Avenue(26th Street—69th Street). <br /> • <br /> • <br /> Community Development Department Indian River County 12 <br /> APPENDIX A—Transportation Amendments <br />
The URL can be used to link to this page
Your browser does not support the video tag.