My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-090
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-090
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 1:30:42 PM
Creation date
6/17/2019 11:08:50 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Plan
Approved Date
06/11/2019
Control Number
2019-090
Agenda Item Number
10.A.1.
Entity Name
IRC Comprehensive Plan 2030 (with RESO 2019-041)
Subject
Text Amendments for Capital Improvements and Transportation
Text of amendments sent to state and regional authority for approval before adoption
Document Relationships
2019-041
(Agenda)
Path:
\Resolutions\2010's\2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Comprehensive Plan <br />improvements program. For <br />list, the total estimated cost <br />overall general fund revenue <br />�j 1) <br />J <br />ifTe <br />\%1.;1111`1 <br />r, J <br />G TT <br />(TTfir=' 4 )' <br />c <br />Concurrency Management Plan <br />To ensure that level -of -service standards are maintained, it is necessary to have a system in place <br />that provides the criteria for measuring facility capacity, assessing development demand on <br />applicable facilities, and monitoring service levels for applicable facilities. That system will set the <br />parameters for issuing development orders consistent with level -of -service standards. <br />While this concurrency management plan sets policies and establishes a process, the specific <br />application of this system is through the County's land development regulations. As per state <br />requirements, those regulations define the details of the concurrency management system and <br />establish its administrative requirements. <br />The major purpose of the concurrency management system is to detail the specifics of implementing <br />the County's level -of -service standards. For that reason, the concurrency management system must <br />apply to all development activity in the County. The system must then identify the applicable <br />standards for each facility, the geographic scope of each facility, and the method of monitoring <br />facility capacity changes. Most importantly, this system must specify when facilities are considered <br />available. <br />Project Applicability <br />All development orders issued by the County and identified below must comply with the concurrency <br />management plan and meet level -of -service standards. Development orders are County approvals for <br />construction and/or land development activity. Specifically, development orders consist of the <br />following: comprehensive plan amendments, rezonings, site plan approvals, preliminary plat <br />approvals, development of regional impact (DRI) approvals, planned development preliminary <br />approvals, and building permit approvals for multi aingle'family projects. <br />e <br />• . - <br />Within Indian River County, the impact from the construction of a single family home on an existing <br />subdivision platted lot or legally created single-family parcel may—will constitute a de minimus <br />impact on public facilities and thus be exempt from the concurrency requirement. Concurrency <br />traffic impacts for single-family homes will be accounted for through tracking single-family trips and <br />an annual traffic count update of the County's Concurrency Management System. Single — family <br />Community Development Department <br />Adopted ((I , 2019, Ordinance 2019-011 <br />Indian River County <br />40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.