My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-090
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-090
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 1:30:42 PM
Creation date
6/17/2019 11:08:50 AM
Metadata
Fields
Template:
Official Documents
Document Relationships
2019-041
(Agenda)
Path:
\Resolutions\2010's\2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Comprehensive Plan <br />Capital Improvements Element <br />trips tracked through this accounting system will be considered in development project traffic studies. <br />Service Standards <br />Level -of -service standards for concurrency related facilities are established in this plan for the <br />following facilities: sanitary sewer, potable water, solid waste, stormwater management, recreation, <br />public schools, and transportation. Those are explained in detail in the applicable comprehensive <br />plan elements. <br />For each facility, level -of -service is a measure of the relationship between demand for the service and <br />the capacity of the facility. Capacity, however, is measured differently for each type of facility. <br />Table 6.16 identifies both the capacity and demand measures for each public facility. Those <br />measures are addressed in detail, and existing capacities are identified in the applicable <br />Comprehensive Plan Elements. <br />Table 6.16: Service Level Measures for Concurrency Related Facilities <br />Public Facility Category <br />Specific Facility <br />Capacity Measure <br />Demand Measure <br />Geographic Scope <br />Transportation <br />Roadway <br />Volume of cars <br />accommodated over time <br />Peak Season/Peak <br />Direction/Peak Hour Trips <br />Affected Roadways <br />Sanitary Sewer <br />Treatment Plant <br />Treatment design capacity <br />(GPD <br />Generation Rate (GPD) <br />Service Area <br />Potable Water <br />Treatment Plant <br />(GPD Treatment design capacity <br />Generation Rate (GPD) <br />Service Area <br />Solid Waste <br />Landfill <br />Volume in active cell (cubic <br />yards) <br />Generation Rate (tons per <br />capita per year) <br />Entire County <br />Recreation <br />Parks <br />Acres of park land <br />Acres of parks per <br />thousand population <br />Entire County <br />Stormwater Management <br />Drainage <br />conveyances <br />Volume of water <br />Volume of stormwater <br />outfalling for design storm <br />Basin <br />Education" <br />Public Schools (K- <br />12) <br />Number of students <br />accommodated over time <br />Enrolled Students/ Future <br />Student Generation <br />Service Area <br />*Limited to participating Schools owned and operated by the Indian River County School District <br />Concurrency requires that each facility within the geographic scope of a proposed project's impact <br />area have sufficient capacity to accommodate the project's demand. If that capacity is not available, <br />the project cannot be approved. The principal function of the concurrency management system then <br />is to provide a mechanism whereby demand and capacity measures can be compared on a project by <br />project basis. <br />Community Development Department <br />Adopted , 2019, Ordinance 2019- TI <br />Indian River County <br />41 <br />Appendix A - CIE Amendment <br />
The URL can be used to link to this page
Your browser does not support the video tag.