My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/07/2019
CBCC
>
Meetings
>
2010's
>
2019
>
05/07/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2019 12:53:40 PM
Creation date
6/17/2019 10:11:37 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/07/2019
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. Describe your county's existing E911 system. Include specific information on <br />existing system equipment upgrades and when the installation of this equipment <br />was completed. <br />The Sheriffs Department has a Primary PSAP in Vero Beach which direct dispatches <br />law enforcement calls throughout the unincorporated area. This PSAP also direct <br />dispatches fire and rescue calls throughout the county including the City of Vero Beach <br />and the City of Sebastian. However, the cities of Sebastian and Vero Beach each have <br />a primary PSAP for their respective Police Departments. The Indian River County <br />Emergency Operations Center serves as the County backup. The system is type 4 - <br />Wireless Phase II compliant. Our equipment consists of a Geo -Diverse Solacom <br />Selective Router, upgraded November 2018, with Side A in the EOC and Side B in the <br />Sheriffs Office. <br />6. Describe the scope of work for the proposed project including any goal(s) and <br />objectives. Include the tasks to be performed as part of the project. Provide <br />scope of work in quantifiable units of deliverables that shall be received and <br />accepted. For each deliverable specify the required minimum level of service to <br />be performed and the criteria for evaluating the successful completion of each <br />deliverable. <br />Phase One: Project Initiation <br />Introductions and identification of project team members and roles <br />Timeline and deliverable review <br />Project approach review <br />Project communication methods <br />Review process for GIS data submission <br />Review the Map data requirements and data submission form <br />Phase Two: Software Map Build <br />Indian River County's GIS data schema transformed into the Map data schema <br />A map package (.mmpk) will be created for use within the Map <br />A GIS data, MSAG, and ALI database Analysis report will be delivered, following the <br />analysis completion <br />Creation of local area configuration file (.mmds), if local imagery is loaded into the <br />Map. <br />Phase Three: System Configuration and Implementation <br />Install and configure the proposed software <br />Configure settings and features <br />Assist in standard system set up <br />Application for E911 State Grant Program , revised 01/2018 <br />Page 12 <br />W Form 3A, incorporated by reference in Fla. Admin. Code R. 60FF1-5.003 E911 State Grant <br />47 <br />
The URL can be used to link to this page
Your browser does not support the video tag.