My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-090
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-090
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 1:30:42 PM
Creation date
6/17/2019 11:08:50 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Plan
Approved Date
06/11/2019
Control Number
2019-090
Agenda Item Number
10.A.1.
Entity Name
IRC Comprehensive Plan 2030 (with RESO 2019-041)
Subject
Text Amendments for Capital Improvements and Transportation
Text of amendments sent to state and regional authority for approval before adoption
Document Relationships
2019-041
(Agenda)
Path:
\Resolutions\2010's\2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Comprehensive Plan Capital Improvements Element <br />➢ Minimum road crown elevation for existing roads shall be raised during <br />resurfacing/rebuilding to the flood elevation resulting from the 2 year/24 hour storm <br />event on local streets. <br />➢ The center two lanes of rebuilt roads must be at or above flood levels resulting from a <br />10 year 24 hour storm event on Arterial and Collector roads. <br />➢ All drainage basins will meet the following level of service standard: <br />10-Year/24 Hour Storm Event <br />The county hereby adopts the following water quality level -of -service standard: <br />➢ As a minimum, retention of the first one inch of rainfall is required prior to offsite <br />discharge. An additional 50% treatment is required for all direct discharge into the <br />Sebastian River and into the Indian River Lagoon due to its designation as an <br />outstanding Florida water, as required by state law. <br />➢ Potable Water <br />The following level -of -service standard is adopted for the county's potable water facilities, and shall <br />be utilized for determining the availability of facility capacity and demand generated by a <br />development: <br />➢ Countywide level -of -service standard of 250 gallons per day per equivalent residential <br />unit. <br />➢ Solid Waste <br />The following level -of -service standard is adopted for solid waste facilities in the county, and shall be <br />used as the basis for determining the availability of facility capacity and demand generated by a <br />development: <br />➢ Countywide level -of -service standard of 2.2 tons or 3.67 cubic yards per capita for <br />permanent plus weighted peak seasonal population per year. <br />➢ Sanitary Sewer <br />The following level -of -service standard is adopted for the county's sanitary sewer facilities, and shall <br />be utilized for determining the availability of facility capacity and demand generated by a <br />development: <br />➢ Countywide level -of -service standard of 250 gallons per day per equivalent residential <br />unit with a peak monthly flow factor of 1.25. <br />Community Development Department Indian River County <br />Adopted , 2019, Ordinance 2019- <br />54 <br />Appendix A - CIE Amendment <br />
The URL can be used to link to this page
Your browser does not support the video tag.