Laserfiche WebLink
Bowman <br />CONSULTING <br />Exhibit C <br />Amendment No.3 <br />June 11, 2019 <br />Mr. William Johnson, P.E. <br />Roadway Production Engineer <br />Indian River County <br />1801 27th Street — Building A <br />Vero Beach, FL 32960 <br />RE: IRC 1325 — 58th Avenue FDR, Proposal for Additional Engineering Services, Left Trun <br />Widening <br />Dear Mr. Johnson: <br />On May 24, 2019 the County requested that Consultants provide a provide proposal to widen 58th <br />Avenue between 77th Street and 81st Street to allow for bi-direction center turning movements outside <br />of the existing left turn lanes envelope. In phone discussions with you, we determined that the work <br />will include starting at approximately the first entrance to the WTP.and extend north to the intersection <br />of 81st Street. North of the intersection will remain the same so as not to encroach into the area of the <br />canal crossing. This proposal covers the additional work that Bowman and Lassiter Transportation <br />Group will perform. No other subconsultants are involved with this request. <br />We have evaluated the issues associated with the proposed widening and the following is a summary <br />of our findings. Road widening will take place between 546+69 to 565+57. We see all the road <br />widening taking place on the easterly side due to the constraints on the west side. We propose to <br />keep the crown of road where it is currently located as it falls on a lane line and the extended slope will <br />reduce the grade difference to existing. With the widening the ditch will need to be relocated further to <br />the east. At some locations the ditch will reduce the cover over existing utilities and cause the utilities <br />to fall within the limits of the ditch. Valves on larger lines will be exposed. One power pole appears to <br />be within the clear zone that will need to be relocated, and this will require additional R/W at the park or <br />an easement. This proposal assumes that the County will obtain any additional R/W or easements. <br />Driveways serving the park will need to be redesigned. Trees in the area of the park will need to be <br />removed. We will need to relocate the proposed fiber optic line along this corridor. This will also <br />require updating the SWPPP sheets. This proposal does not include a drainage permit based on the <br />other work at 69th Street not requiring one. <br />The work will involve modifying the model and regenerating the cross-sections to provide the data on <br />the work associated with the widening. The redesigns discussed above will also need to be <br />accomplished. We will also need to update the quantities, bid schedule and estimate. FDR emulsion <br />4450 W. Eau Gallie Blvd., Suite 232, Melbourne, FL 32934 <br />