Laserfiche WebLink
Page 2 <br />November 9, 2018 <br />and cement quantities and additional base material will also need to be updated. We will also develop <br />a new base sheet for Lassiter to provide the striping changes. <br />SCHEDULE <br />With current work Toad we estimate this will take 6 to 7 weeks to complete the work from notice of <br />authorization <br />COMPENSATION <br />We will provide the requested services on a Lump Sum Cost, with estimated task breakdown below: <br />Additional Design Services: <br />Task <br />Design Services <br />Fee <br />Bowman <br />As listed in the above table <br />$19,776 <br />Lassiter <br />As listed in the attached proposal <br />$9,360 <br />Mark up on Subconsultants <br />$0 <br />Total <br />$29,139 <br />Sincerely, <br />Eric L. Flavel , PE, F -ASCE <br />Project Manager/Senior Engineer <br />Bowman Consulting <br />321.270.8993 <br />eflavell(a�bowmanconsulting.com <br />Erik Juliano, PE, <br />Branch Manager <br />Bowman Consulting <br />321.270.8997 <br />eiuliano(c�bowmanconsulting.com <br />