My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-100
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-100
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 1:36:31 PM
Creation date
7/5/2019 2:17:26 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
07/02/2019
Control Number
2019-100
Agenda Item Number
8.D.
Entity Name
Bowman Consulting Group Ltd
Subject
For Professional Services Design Upgrades
Area
58th Avenue 77th Street and 81st street
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 <br />November 9, 2018 <br />and cement quantities and additional base material will also need to be updated. We will also develop <br />a new base sheet for Lassiter to provide the striping changes. <br />SCHEDULE <br />With current work Toad we estimate this will take 6 to 7 weeks to complete the work from notice of <br />authorization <br />COMPENSATION <br />We will provide the requested services on a Lump Sum Cost, with estimated task breakdown below: <br />Additional Design Services: <br />Task <br />Design Services <br />Fee <br />Bowman <br />As listed in the above table <br />$19,776 <br />Lassiter <br />As listed in the attached proposal <br />$9,360 <br />Mark up on Subconsultants <br />$0 <br />Total <br />$29,139 <br />Sincerely, <br />Eric L. Flavel , PE, F -ASCE <br />Project Manager/Senior Engineer <br />Bowman Consulting <br />321.270.8993 <br />eflavell(a�bowmanconsulting.com <br />Erik Juliano, PE, <br />Branch Manager <br />Bowman Consulting <br />321.270.8997 <br />eiuliano(c�bowmanconsulting.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.