My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-103
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-103
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 1:38:36 PM
Creation date
7/11/2019 9:49:32 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
07/09/2019
Control Number
2019-103
Agenda Item Number
8.N.
Entity Name
Arcadis US
Subject
Procure and administrate rehabilitation of RAS/WAS pumps at central wastewater treatment plant
Amendment 1 to Work order 1
Area
Central Wastewater Treatment Plant
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARcAD I SDesign us ralCoannsultarduy <br />fornat <br />built assets <br />• Provide limited construction administration services <br />• Produce record drawings based on contractor supplied "as builts" and conditions observed during <br />site visits <br />2 SCOPE OF WORK <br />2.1 Task 1 — Project Management <br />The CONSULTANT will provide the following services throughout the duration of the project as needed: <br />• Coordination between CONSULTANT Project Team and COUNTY Project Team. <br />• Manage project schedule and budget. <br />• Prepare and distribute agendas and support documentation for project meetings and workshops. <br />• Prepare and distribute meeting summaries from project meetings and workshops. <br />• Prepare and submit monthly progress reports and invoices. <br />• Preparation and implementation of Quality Control Plan and CAD Plan <br />Deliverables: <br />• Meeting Summaries <br />• Monthly Progress Reports <br />• Monthly Invoices <br />2.2 Task 2 —Project Kickoff and Site Visit <br />CONSULTANT shall prepare and lead one project kickoff meeting with appropriate COUNTY staff to <br />review the scope of work, project schedule, data needs and key milestones. Prior to the kickoff meeting, <br />CONSULTANT will submit a proposed agenda that will include: (1) items to be discussed, (2) specific <br />questions to be answered, and (3) additional data requests. <br />Immediately following the project kickoff meeting, CONSULTANT and COUNTY will conduct a <br />walkthrough of the RAS/WAS Pumps to gather necessary information on the system configuration and <br />operation. The team will obtain input on the design, operational and maintenance issues, and will <br />interview staff to identify RAS/WAS system constraints and requirements. <br />2.3 Task 3 — Basis of Design <br />2.3.1 Draft Preliminary Design Technical Memorandum <br />Utilizing information obtained from the kickoff meeting, site visit and data provided by the OWNER, <br />CONSULTANT will assess and confirm the limits of the replacement needs for the associated piping, <br />
The URL can be used to link to this page
Your browser does not support the video tag.