My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-107
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-107
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 1:52:59 PM
Creation date
7/23/2019 12:45:06 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
07/16/2019
Control Number
2019-107
Agenda Item Number
8.H.
Entity Name
Kimley-Horn and Associates, Inc.
Subject
58th Avenue Roadway Improvements Utility Relocation Project
Work Order No. 17
Area
53rd Street to 57th Street
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROPOSAL FOR <br />58TH Avenue Roadway Improvements Utility Relocation Project <br />This Work Order Number 17 is entered into as of this 16th day of July , <br />2019, pursuant to that certain Continuing Consulting Engineering Services Agreement for <br />Professional Services entered into as of this 17th day of April, 2018 (collectively referred to as <br />the "Agreement"), by and between INDIAN RIVER COUNTY, a political subdivision of the State <br />of Florida ("COUNTY") and KIMLEY-HORN AND ASSOCIATES, INC. ("Consultant"). <br />The COUNTY has selected the Consultant to perform the professional services set forth on <br />Exhibit A (Scope of Work), attached to this Work Order and made part hereof by this reference. <br />The professional services will be performed by the Consultant for the fee schedule set forth in <br />Exhibit B (Fee Schedule), attached to this Work Order and made a part hereof by this reference. <br />The Consultant will perform the professional services within the timeframe more particularly <br />set forth in Exhibit C (Time Schedule), attached to this Work Order and made a part hereof by <br />this reference all in accordance with the terms and provisions set forth in the Agreement. <br />Pursuant to paragraph 1.4 of the Agreement, nothing contained in any Work Order shall conflict <br />with the terms of the Agreement and the terms of the Agreement shall be deemed to be <br />incorporated in each individual Work Order as if fully set forth herein. <br />SCOPE OF WORK <br />58th Avenue Roadway Improvements Utility Relocation Project <br />In conjunction with the County proposed improvements to 58th Avenue approximately <br />between 53rd Street and 57th Street, the COUNTY desires to relocate existing utilities as to <br />avoid conflicts with the proposed roadway improvements. The identified necessary <br />utility relocations consist of the following: <br />• Relocate existing 20" water main over the IRFWCD North Relief Canal <br />• Relocation existing 8" force main over the IRFWCD North Relief Canal <br />• Relocate existing 6" force main (approx. 600 feet) along 58th Avenue south of 57th <br />Street <br />• Relocate existing utilities to accommodate proposed storm drainage <br />improvements <br />The Consultant will retain a sub -consultant (Brierley Associates) to assist in evaluating <br />alternative horizontal directional drill feasibility, alternative routes and pipe material <br />11Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.