Laserfiche WebLink
PROPOSAL FOR <br />58TH Avenue Roadway Improvements Utility Relocation Project <br />This Work Order Number 17 is entered into as of this 16th day of July , <br />2019, pursuant to that certain Continuing Consulting Engineering Services Agreement for <br />Professional Services entered into as of this 17th day of April, 2018 (collectively referred to as <br />the "Agreement"), by and between INDIAN RIVER COUNTY, a political subdivision of the State <br />of Florida ("COUNTY") and KIMLEY-HORN AND ASSOCIATES, INC. ("Consultant"). <br />The COUNTY has selected the Consultant to perform the professional services set forth on <br />Exhibit A (Scope of Work), attached to this Work Order and made part hereof by this reference. <br />The professional services will be performed by the Consultant for the fee schedule set forth in <br />Exhibit B (Fee Schedule), attached to this Work Order and made a part hereof by this reference. <br />The Consultant will perform the professional services within the timeframe more particularly <br />set forth in Exhibit C (Time Schedule), attached to this Work Order and made a part hereof by <br />this reference all in accordance with the terms and provisions set forth in the Agreement. <br />Pursuant to paragraph 1.4 of the Agreement, nothing contained in any Work Order shall conflict <br />with the terms of the Agreement and the terms of the Agreement shall be deemed to be <br />incorporated in each individual Work Order as if fully set forth herein. <br />SCOPE OF WORK <br />58th Avenue Roadway Improvements Utility Relocation Project <br />In conjunction with the County proposed improvements to 58th Avenue approximately <br />between 53rd Street and 57th Street, the COUNTY desires to relocate existing utilities as to <br />avoid conflicts with the proposed roadway improvements. The identified necessary <br />utility relocations consist of the following: <br />• Relocate existing 20" water main over the IRFWCD North Relief Canal <br />• Relocation existing 8" force main over the IRFWCD North Relief Canal <br />• Relocate existing 6" force main (approx. 600 feet) along 58th Avenue south of 57th <br />Street <br />• Relocate existing utilities to accommodate proposed storm drainage <br />improvements <br />The Consultant will retain a sub -consultant (Brierley Associates) to assist in evaluating <br />alternative horizontal directional drill feasibility, alternative routes and pipe material <br />11Page <br />