My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-107
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-107
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 1:52:59 PM
Creation date
7/23/2019 12:45:06 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
07/16/2019
Control Number
2019-107
Agenda Item Number
8.H.
Entity Name
Kimley-Horn and Associates, Inc.
Subject
58th Avenue Roadway Improvements Utility Relocation Project
Work Order No. 17
Area
53rd Street to 57th Street
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Order No. 17 <br />58th Avenue Roadway Improvements <br />Utility Relocation Project <br />recommendations associated with the proposed utility relocations in conjunction with the <br />IRFWCD North Relief Canal. <br />A. Utility Plans: <br />The following is the anticipated utility improvement associated within the project limits: <br />1. The utility plan sheets will be drawn at a scale of 1" = 40' prepared on 11" x 17" <br />sheets. <br />2. All quantities shall reference FDOT Pay Item Numbers. <br />3. All specifications shall reference the FDOT Specifications for Road and Bridge <br />Construction and/ or Indian River County Utility Standards. Any deviations or special <br />specifications not included in specifications will be provided in the Technical <br />Specifications. <br />The proposed utility improvements will be submitted to the COUNTY for review and <br />comment at 60%, 90% and Final Design submittal stages. Review submittals will consist of <br />three (3) hard copies of utility plans along with an opinion of probable construction cost. <br />B. Utility Permit: <br />To support the above described utility improvement, the Consultant will prepare and <br />submit a Florida Department of Environmental Protection (FDEP) Specific Permit to <br />Construct Public Water Systems Components, a FDEP Domestic Waste Water Collection <br />/Transmission System Permit and an IRFWCD Application for Utility Construction Permit. <br />Permit agency coordination assumes one (1) request for additional information (RAI) to be <br />received from FDEP and IRFWCD associated with the applications. The Consultant has <br />included the $900 FDEP application fees within the work order fee. The Final Plans will be <br />provided in Autodesk Civil 3D format. <br />Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.