My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/21/2019 (3)
CBCC
>
Meetings
>
2010's
>
2019
>
05/21/2019 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2019 1:00:10 PM
Creation date
7/24/2019 10:42:04 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/21/2019
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 5 of 8 <br />S-16 - Site Plan —Alternate "A" - Typical Wastewater Pumping Station. Drawing has been re -oriented from <br />a portrait to a landscape title block. The Site Plan- Alternate B has been moved to a new drawing S-16 A. <br />A call -out note has been added: "Data flow tower foundation top shall be 6" above finished grade. <br />Location to be approved by IRCDUS". The Notes section has been moved to a new drawing S-16 B. <br />S -16A - Site Plan — Alternate "B" - Typical Wastewater Pumping Station. This is a new drawing separating <br />Alternate "A" and "B", which provides clarity to an otherwise busy drawing. <br />S -16B - Site Plan Notes - Typical Wastewater Pumping Station. New drawing. All Site Plan Notes have been <br />moved to this drawing. Note 9 has been revised to read: "Data tower foundation top shall be 6" above <br />finished grade." <br />S-17 - Electric Service Entrance - Meter/Panel Box - Typical Wastewater Pumping Station. The notes <br />regarding the conduits from the control panel to the pump station have been revised to read: <br />"Underground shall be SCH 80 PVC. Above ground shall be SCH 80 aluminum". The note for the control <br />panel has been revised to read: "Powder coated 316 Stainless Steel". <br />S-18 - Control Panel Inner Door Layout. The drawing title has been re -named. The box note in red has <br />been revised to read: "Refer to Specifications Section 10.". <br />S-18 A - Control Panel Back Panel Layout. This drawing has been re -numbered from S-19 to S -18A. The <br />drawing title has been re -named. The box note in red has been revised to read: "Refer to Specifications <br />Section 10.". <br />S-19 - Pumping Station General Notes - Typical Wastewater Pumping Station. This drawing has been re- <br />numbered from S-20 to S-19. Note 16 has been revised to include: "All access drives shall be a minimum <br />of 45' long". Note 21, which pertains to location of the lift station, has been revised from 200' to read <br />"50' away from homes". The box note in red has been revised to read: "Refer to Specifications Section <br />10.". <br />S -19A - Pumping Station General Notes (Continued) - Typical Wastewater Pumping Station. This drawing <br />was re -numbered from S-20 to S -19A and is a continuation of General Notes. Note 25 has been revised to <br />call -out the correct referenced drawings. Note 30 has been revised to include "Powder Coated 316 <br />Stainless Steel". Note 35 has been revised by deleting "City of Vero Beach" (as a power supply). County <br />Pumping Stations only have FP&L. The box note in red has been revised to read: "Refer to Specifications <br />Section 10...". <br />S-20 - Pumping Station Electrical Notes - Typical Wastewater Pumping Station. This drawing is new. The <br />Electrical Notes have been moved to a stand-alone page. The box note in red has been revised to read: <br />"Refer to Specifications Section 10.". <br />S-21 - Generator Notes and Float Controls - Typical Wastewater Pumping Station. This drawing is new. The <br />Generator Notes were moved to a stand-alone page. The Float Control System chart has been enlarged <br />for clarity. The box note in red has been revised to read: "Refer to Specifications Section 10.". <br />S-22 - Force Main Service Line for Private Pumping Station. New Drawing. The drawing illustrates the <br />minimum requirement to be accepted by IRCDUS for privately constructed/owned pump stations. <br />ATTACHMENT A, Construction Standards, May 2019 <br />85 <br />
The URL can be used to link to this page
Your browser does not support the video tag.