My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/21/2019 (3)
CBCC
>
Meetings
>
2010's
>
2019
>
05/21/2019 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2019 1:00:10 PM
Creation date
7/24/2019 10:42:04 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/21/2019
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 6 of 8 <br />R-1 - Reclaimed Water Meter/Valve Assembly Detail. The Notes section has been moved to R-2 A. <br />R-2 - Reclaimed Water Discharge and Stilling Well Assembly Detail. The Notes section has been moved to <br />R-2 A. <br />R-2 A - Reclaimed Water Notes. New drawing. Notes from R-1 and R-2 have been combined and edited <br />for clarity. <br />M-1 - Trench Detail (Unpaved Easements). The Notes section has been moved to a new drawing M-1 A. <br />The call -out note for Detection Tape has been revised to reference the correct drawing. Two notes have <br />been added for "Compaction" and Restoration" requirements. <br />M -1A - Trench Detail Notes. New drawing. The Notes from M-1 and M-2 have been combined and edited <br />for clarity. <br />M-2 - Trench Detail (Paved Areas & Shoulders). The Notes section has been moved to new drawing M - <br />1A. A new Note Section has been added with notes that pertain to this drawing. Note 4 allows for flowable <br />fill with approval. <br />M-3 - Restrained Pipe Lengths and Schedule Notes. Restrained length charts have been re-created in an <br />Excel format and imported into the drawing for clarity of font. A Note has been added to the bottom of <br />the drawing panel and reads: "All in-line valves shall be treated.". <br />M-4 - Utility Crossings. The Drawing has been revised by adding one length of pipe on either side of conflict <br />crossing piping and inserting the dimension 3'0" minimum on each side of conflict. Note 7 has been added <br />and reads: "IRCDUS may require air release valves.". <br />M-5 - Tapping Sleeve and Valve Assembly. New drawing. <br />M-6 - Valve and Box Detail. This drawing has been re -numbered from M-5 to M-6. A call -out note has been <br />revised to include lime rock, "or flowable fill". A call -out note has been added along with "Valve Box <br />Stabilizer". All Notes have been moved to M -6A. <br />M -6A - Valve and Box Detail Notes. New drawing. Notes are from M-6. Note 2 has been deleted, and notes <br />have been re -numbered. (Re -numbered) Note 4 has been revised to reference the correct drawing. (Re- <br />numbered) Note 6 has been revised to reference the correct drawing. <br />M-7 - Valve Box Pad. This drawing has been re -numbered from M-6 to M-7. Note 3 has been revised to <br />reference the correct drawing. Note 4 has been revised to reference the correct drawing. <br />M-8 - Air Release Valve Manhole Below Ground. This drawing has been re -numbered from M-7 to M-8. <br />Note 3 has been revised to reference the correct drawing. Note 4 has been revised to reference the <br />correct drawing. A downward facing screened vent for potable application has been added, along with a <br />call -out note to the air release valve. <br />M-9 Air Release Valve Assembly Above Ground. This drawing has been re -numbered from M-8 to M-9. <br />Note 3 has been revised to reference the correct drawing. <br />ATTACHMENT A, Construction Standards, May 2019 <br />86 <br />
The URL can be used to link to this page
Your browser does not support the video tag.