My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/21/2019 (3)
CBCC
>
Meetings
>
2010's
>
2019
>
05/21/2019 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2019 1:00:10 PM
Creation date
7/24/2019 10:42:04 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/21/2019
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MKI SERVICES, INC. <br />210 University Drive, Suite 500 • Coral Springs, FL 33071 • (954) 755-2092 Fax (954) 341-9370. <br />725 Primera Boulevard, Suite 155 ■ Lake Mary, FL 32746 In (407) 805-0063 Fax (407) 805-0062 <br />DATE: 5/14/19 <br />TO: Mr. Richard Meckes <br />FROM: W. Ben McDorman <br />SUBJECT: Indian River County WestWRF <br />Hydro GritCleanse TM Installation with Upgrades <br />Mr. Meckes: <br />MKI Services, Inc. offers the following described equipment and services under the terms <br />and prices stated in this proposal. <br />EQUIPMENT <br />1. One (1) Hydro GritCleanseTM <br />o Upgrade of grit cleanse piping and new fluidizing manifold and flow meter <br />•o Spare seal and bearing <br />2. Two (2) Hydro Floatable Spray Systems for each 12 -foot diameter Headcell <br />3. Two (2) Control Panel(s) <br />o Control Panel 1 to control Grit Cleanse • <br />o Control Panel 2 to control FOG system and Grit Pump #2 <br />SERVICES <br />Mechanical Scope Includes: <br />1. Permanently install GritCleanseTM and remove temporary apparatus <br />a. Move the Hydro GritCleanseTM further into the building so the Discharge Pipe is <br />located directly above the existing Effluent Piping, allowing the dumpster to be <br />located fully inside the building. <br />i. Removal of existing concrete pads and installation of suitable pads for the <br />Hydro GritCleanse TM <br />91 <br />
The URL can be used to link to this page
Your browser does not support the video tag.