Laserfiche WebLink
IMI SERVICES, INC. <br />b. Replace the existing PVC spray manifold with stainless steel, including isolation <br />valves and unions for easy removal. <br />2. Five (5) days of startup services by a Hydro Field Technician <br />Electrical Scope Includes: <br />1. Remove One 2007 Control Works panel for control of existing operating HC -pump SC -GS <br />train #1. <br />2. Retain HD16766 grit cleanse panel to control Grit Cleanse now on train #2 <br />a. Install Grit Cleanse panel where existing Control Works panel was. <br />3. Provide new panel to control: <br />a. FOG systems for headcell on train #1 & train #2. <br />b. Pump for train #2 <br />Items excluded from our erection proposal: <br />• Permits <br />• Painting <br />ACCESS <br />The basis of this proposal is that it is the responsibility of Indian River County to provide <br />MKI Services with access immediately to the grit removal processes at the facility. Access <br />is to be provided on an uninterrupted basis. Disruptions or work stoppages shall be cause <br />for extra compensation for moving or waiting. <br />NON-UNION <br />We are a merit contractor (open shop) and as such will perform all fieldwork with personnel <br />not affiliated with trade unions. The Purchaser is responsible for providing and maintaining <br />site conditions compatible with this labor status. <br />CONFINED SPACE <br />By the definitions of confined space in accordance with the OSHA regulations, the subject <br />work is not in a confined space. If Purchaser's safety regulations are in disagreement with <br />this interpretation, then we need to be advised as to what rules will be required and be <br />given an opportunity to price the cost of those rules. <br />92 <br />