My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/11/2019
CBCC
>
Meetings
>
2010's
>
2019
>
06/11/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2019 1:11:10 PM
Creation date
7/25/2019 9:30:30 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
06/11/2019
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Element <br />Policy #, <br />Objective #, <br />Text <br />Summary <br />Page <br /># <br />What the change is <br />Bicycle and Pedestrian maps, transit <br />route maps, and transit needs map. <br />Transportation <br />Text <br />Various outdated references <br />---- <br />Updated text throughout the entire <br />Transportation Element to remove and <br />replace text to reflect completed <br />projects/activities with newer <br />information <br />Transportation <br />Text <br />Various statistical data and monetary <br />figures <br />---- <br />Updated statistical data and monetary <br />figures throughout. <br />Transportation <br />Text <br />Table 4.1 Existing and Committed <br />20 - <br />Updated table based on new <br />Roadways <br />21 <br />information <br />Transportation <br />Text <br />Landscape Improvements <br />34 <br />Updated north county trail limits. <br />Transportation <br />Text <br />Bicycle/Pedestrian <br />34- <br />Updated bike/pedestrian LOS <br />35 <br />Transportation <br />Text <br />Location of GoLine transfer station <br />36 <br />Updated to recognize completion of the <br />166 Street Main Transit Hub.in April <br />2017. <br />Transportation <br />Text <br />Table 4.3A - Transit Quality and <br />37 - <br />Removed old table and inserted <br />Level of Service table <br />38 <br />new/updated table. <br />Transportation <br />Text <br />Table 4.4 — Transportation Service <br />53 <br />Removed outdate table. <br />Providers <br />Transportation <br />Text <br />Major Trip Generators map and list <br />63 - <br />Updated with new data. <br />64 <br />Transportation <br />Text <br />Table 4.5 — Journey to Work <br />65 <br />Updated table with new data. <br />Characteristics <br />Transportation <br />Text <br />Discussion of Level of Service <br />72 - <br />Updated LOS description with recent <br />(LOS) on various major roadways. <br />73 <br />information. Inserted discussion of <br />segments of CR 510 and 37th Street <br />that are currently exceeding LOS "D" <br />and the solution to set the LOS of those <br />segments at LOS "D +20%" as an <br />interim measure until planned road <br />improvements are completed. <br />Transportation <br />Text <br />Table 4.6 - Socioeconomic Data <br />77 - <br />Removed table and inserted new table <br />Summary <br />78 <br />from 2040 Long Range Transportation <br />Plan <br />Transportation <br />Text <br />Table 4.7 — 2030 Potentially <br />83 - <br />Removed old table from 2030 plan and <br />Deficient Roadways <br />90 <br />inserted new table from 2040 plan. <br />Transportation <br />Text <br />2030 Long Range Transportation <br />Plan (LRTP) discussion to adopt all <br />or part of the Enviromnental Land <br />91 <br />Removed as part of 2040 LRTP <br />updates. <br />Management Study one to five cent <br />local option gas tax. <br />Transportation <br />Text <br />Text under the "Prioritization of <br />91 — <br />Updated with 2040 LRTP information. <br />Needs Plan Improvements" section. <br />99 <br />476 <br />
The URL can be used to link to this page
Your browser does not support the video tag.