My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-089B
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-089B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 1:22:05 PM
Creation date
8/6/2019 3:02:56 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
06/11/2019
Control Number
2019-089B
Agenda Item Number
8.E.
Entity Name
Kimley Horn and Associates
Subject
Bulk Acid Tank Replacement at North (Hobart) County Water Plant
Area
North (Hobart) County Water Plant
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ESTIMATE FOR ENGINEERING SERVICES <br />PROJECT: Hobart WTP Acid Tank Replacement 5/1/2019 <br />CLIENT: Indian River County Utilities <br />ESTIMATOR MDM <br />DESCRIPTION: <br />Review existing, prepare documents, coordination <br />DIRECT LABOR ( MAN-HOURS ) <br />PRINC <br />SEN <br />PROF <br />REG <br />PROF <br />JL/FH <br />DES/ <br />P2 (TS/NB) <br />CLK <br />P1 <br />EXP <br />SUB <br />Dir E'p <br />LINE <br />TOTAL <br />NO. <br />TASK <br />1 <br />REVIEW EXISTING CONDITIONS <br />site visit <br />4 <br />4 <br />5200 <br />50 <br />$1,790 <br />review plans <br />2 <br />4 <br />4 <br />56 <br />$1,510 <br />2 <br />DESIGN PLANS & SPECS <br />Prepare drawings w/ photos <br />4 <br />16 <br />48 <br />4 <br />$200 <br />438 <br />$9,402 <br />Prepare specs <br />10 <br />8 <br />113 <br />$2,381 <br />Review comments <br />4 <br />6 <br />4 <br />2 <br />125 <br />$2,577 <br />3 <br />COORDINATION <br />Finalize bid docs <br />4 <br />6 <br />6 <br />90 <br />$1,896 <br />Coordination with purchasing <br />4 <br />2 <br />39 <br />$831 <br />Answer questions <br />2 <br />4 <br />2 <br />61 <br />$1,323 <br />TOTAL HOURS 16 0 52 58 28 400 972 <br />521,710 <br />LABOR ($/HOUR) 235 <br />225 <br />150 <br />105 <br />96 <br />80 <br />$0 <br />SUBTOTAL 3760 <br />0 <br />7800 <br />6090 <br />2688 <br />400 <br />520,738 <br />80 <br />K:\WPB Civil\044572048 - South RO Plant Improvements\Scope\20190708 Hobart Acid Tank Scope.docx Page 3 of 3 <br />$3,300 <br />$14,360 <br />$4,050 <br />$21,710 <br />
The URL can be used to link to this page
Your browser does not support the video tag.