My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-089B
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-089B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 1:22:05 PM
Creation date
8/6/2019 3:02:56 PM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ESTIMATE FOR ENGINEERING SERVICES <br />PROJECT: Hobart WTP Acid Tank Replacement 5/1/2019 <br />CLIENT: Indian River County Utilities <br />ESTIMATOR MDM <br />DESCRIPTION: <br />Review existing, prepare documents, coordination <br />DIRECT LABOR ( MAN-HOURS ) <br />PRINC <br />SEN <br />PROF <br />REG <br />PROF <br />JUFH <br />DES/ <br />P2 (TS/NB) <br />CLK <br />P1 <br />EXP <br />SUB <br />Dir Exp <br />LINE <br />TOTAL <br />NO. <br />TASK <br />1 <br />REVIEW EXISTING CONDITIONS <br />site visit <br />4 <br />4 <br />5200 <br />50 <br />$1,790 <br />review plans <br />2 <br />4 <br />4 <br />56 <br />51,510 <br />2 <br />DESIGN PLANS & SPECS <br />Prepare drawings w/ photos <br />4 <br />16 <br />48 <br />4 <br />5200 <br />438 <br />$9,402 <br />Prepare specs <br />10 <br />8 <br />113 <br />$2,381 <br />Review comments <br />4 <br />6 <br />4 <br />2 <br />125 <br />$2,577 <br />3 <br />COORDINATION <br />Finalize bid docs <br />4 <br />6 <br />6 <br />90 <br />$1,896 <br />Coordination with purchasing <br />4 <br />2 <br />39 <br />$831 <br />Answer questions <br />2 <br />4 <br />2 <br />61 <br />$1,323 <br />TOTALHOURS 16 0 52 58 28 400 972 <br />521,710 <br />LABOR ($/HOUR) 235 <br />225 <br />150 <br />105 <br />96 <br />$0 <br />$0 <br />SUBTOTAL 3760 <br />0 <br />7800 <br />6090 <br />2688 <br />400 <br />S20.738 <br />$0 <br />K:\WPB Civil\044572048 - South RO Plant Improvements\Scope\20190708 Hobart Acid Tank Scope.docx Page 3 of 3 <br />$3,300 <br />$14,360 <br />54,050 <br />521,710 <br />
The URL can be used to link to this page
Your browser does not support the video tag.